SH39 Mangati Stream Bridge Permanent Structure Replacement
New Zealand Transport Agency (Waka Kotahi) - HISTORIC
This is a Physical Works contract for the replacement of the Mangati Stream Bridge (BSN 520) located on SH39 approximately 7 km south of Pirongia. The existing bridge was damaged in the February 2026 flooding and a temporary one-lane bridge has been installed adjacent to the l...
Deadline May 26, 2026