Nikšić MunicipalityPublished 18 Mar 2026Closes Not listed Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m •
Main purpose of this bidding process is procurement of vocational equipment for secondary schools in Montenegro.
The subject of the contract is supply, delivery, unloading, siting and installation, of the vault/cash operations equipment: machines and equipment for the protection of the euro, cash handling and gold testing. Contract is expected to contribute to the strengthening of the insti
Services to act as FIDIC Engineer for the reconstruction of the section Bar-Golubovci (around 40 km of open railway line), including replacement of the permanent way, refurbishment of structures, slope protection works, replacement of OHL and ETS plus modernization of signalling.
Old Royal Capital CetinjePublished 3 Dec 2025Closes Not listed This contract includes the following elements: installation of transit and distribution pipelines of diameter DN32 to DN400, with approximate length of 92 km, construction of new reservoirs and installation of flow meters. reconstruction of the existing water supply network
Procurement of ICT equipment for Schools in Montenegro
Old Royal Capital CetinjePublished 13 Nov 2025Closes Not listed This contract includes the following elements: installation of transit and distribution pipelines of diameter DN32 to DN400, with approximate length of 92 km, construction of new reservoirs and installation of flow meters. reconstruction of the existing water supply network
Support to Public Administration training programme
Ministry of Public WorksPublished 9 Oct 2025Closes Not listed The purpose of the contract is to improve control over imported goods of veterinary and phytosanitary origin. The facility has a gross developed area of 304.39 m², dimensions 30.00 m x 11.90 m, and a height of 3.10 m, with a ground floor (P). The ground floor is level with the te
The subject of the contract shall be the supply and delivery of 6 vehicles for the Directorate for Payments of the Ministry of Agriculture, Forestry and Water Management of Montenegro (IPARD Agency) for the purposes of strengthening of its capacities related to tasks prescribed b
The Statistical Office of Montenegro (MONSTAT) needs to implement a digital transformation of the IT system with the scope to make more data available for tackling societal, climate and environment-related challenges, contributing to healthier, more prosperous and more sustainabl
The overall objective of this project is further fulfillment of the EU accession requirements in Chapter 16 Taxation by further digitalization of excise processes, in line with EU excise legislation. The Project includes development and implementation of Excise movement and contr
This project represents the development and implementation of Automated export system (AES) and Import control system (ICS2) by upgrading of export and import applications existing in CIS with latest EU AES and EU ICS2 EU versions available on the EU level during the duration of
Old Royal Capital CetinjePublished 23 Sept 2025Closes Not listed This contract includes the following elements: installation of transit and distribution pipelines of diameter DN32 to DN400, with approximate length of 92 km, construction of new reservoirs and installation of flow meters. reconstruction of the existing water supply network
The Statistical Office of Montenegro (MONSTAT) needs to implement a digital transformation of the IT system with the scope to make more data available for tackling societal, climate and environment-related challenges, contributing to healthier, more prosperous and more sustainabl