TEDMNE
Construction of Nikšić Wastewater Management System – Sewerage Network Phase II
Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m •