LandsvirkjunPublished 23 Mar 2026Closes Not listed Landsvirkjun hereby invites tenders for the Works consisting of design, manufacture, testing and transportation, either FCA, FOB or DPU (to Icelandic harbour), of one three-phase 82 MVA generator step-up transformer, core type or shell type, for a new generating unit in the Sigal
LandsvirkjunPublished 23 Mar 2026Closes Not listed Landsvirkjun hereby invites tenders for the Works consisting of design, manufacture, testing and transportation, of one of one (1) new 30 MW turbine-generating unit for a new generating unit in the Theistareykir power station, as further described in these Tender Documents no. 20
LandsvirkjunPublished 6 Mar 2026Closes Not listed The Employer hereby invites tenders for service consisting of the repair and refurbishment of a 5 stage double flow, total 10 stages 30MW geothermal turbine rotor previously operated and located in Krafla Geothermal Station, Iceland. The Employer reserves the right to finalise th
LandsvirkjunPublished 23 Feb 2026Closes Not listed It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in len
LandsvirkjunPublished 19 Feb 2026Closes Not listed Landsvirkjun invites tenders for the maintenance of roads and areas at Fljótsdalur Power Station.
LandsvirkjunPublished 19 Feb 2026Closes Not listed Landsvirkjun hereby invites tenders for Works consisting of the design, manufacture, shop testing, delivery, installation, field testing and commissioning of gate equipment, steel penstock, flow meters and concrete Work, as further described in these Tender documents no. 2025-43.
LandsvirkjunPublished 17 Feb 2026Closes Not listed Landsvirkjun invites parties to participate in a dynamic purchasing system for the rental of vehicles.
LandsvirkjunPublished 23 Jan 2026Closes Not listed It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in len
LandsvirkjunPublished 21 Jan 2026Closes Not listed Landsvirkjun hereby invites tenders for Works consisting of the design, manufacture, shop testing, delivery, installation, field testing and commissioning of gate equipment, steel penstock, flow meters and concrete Work, as further described in these Tender documents no. 2025-43.
LandsvirkjunPublished 19 Jan 2026Closes Not listed Landsvirkjun hereby invites tenders for Works consisting of the construction of the powerhouse extension, excavation and concrete embedment of penstock from the powerhouse to the opening of the concrete duct in the existing dam, extending existing powerhouse systems such as crane
LandsvirkjunPublished 13 Jan 2026Closes Not listed The Contracting Authority intends to procure consultancy services to support the development of its corporate strategy and an associated strategy implementation plan. The services will include analysis of the Employer’s current strategic position and support in defining strategic
LandsvirkjunPublished 13 Jan 2026Closes Not listed The Works comprise the manufacture of portable construction camp units, including transportation, installation and finishing of the units, earthworks and concrete works, as well as the installation and connection of sewer pipes, cold potable water supply and electrical installati
LandsvirkjunPublished 17 Dec 2025Closes Not listed Landsvirkjun is preparing the construction of the Hvammur Hydropower Plant. As part of this preparation, all loose material is to be excavated down to bedrock in the areas where the main structures of the plant are planned. In addition, bedrock shall be excavated in specific desi
LandsvirkjunPublished 8 Dec 2025Closes Not listed The Þeistareykir Geothermal Topping Unit will be part of Þeistareykir Geothermal Station in northeast Iceland. The power station is owned and operated by Landsvirkjun, Iceland’s national power company and largest energy generator, operating 18 power stations across Iceland, gener
LandsvirkjunPublished 7 Nov 2025Closes Not listed The Þeistareykir Geothermal Topping Unit will be part of Þeistareykir Geothermal Station in northeast Iceland. The power station is owned and operated by Landsvirkjun, Iceland’s national power company and largest energy generator, operating 18 power stations across Iceland, gener
LandsvirkjunPublished 31 Oct 2025Closes Not listed The service consists of transporting goods from the capital area and other nearby settlements to Landsvirkjun’s workplaces in the Þjórsá area, as well as carrying out other transport assignments that the buyer commissions the seller to perform from time to time.
LandsvirkjunPublished 21 Oct 2025Closes Not listed Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation(PMC). The Project, consists of compressing non-condensable gas (NCG) in a liquid-ring compressor package(s) as part of a treatment system at a geothermal power plant in Northern Iceland in p
LandsvirkjunPublished 15 Oct 2025Closes Not listed Landsvirkjun is an energy utility company owned by the Icelandic state, hereinafter referred to as the Purchaser. Landsvirkjun is Iceland’s largest electricity generator, with 18 power stations all over Iceland. The Authority produces 70% of all electricity in Iceland, from 100%
LandsvirkjunPublished 22 Sept 2025Closes Not listed Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation(PMC). The Project, consists of compressing non-condensable gas (NCG) in a liquid-ring compressor package(s) as part of a treatment system at a geothermal power plant in Northern Iceland in p
LandsvirkjunPublished 8 Sept 2025Closes Not listed Landsvirkjun (the Authority) is Iceland’s largest electricity generator, with 18 power stations all over Iceland. The Authority produces 70% of all electricity in Iceland, from 100% renewable energy resources: hydroelectric energy, geothermal energy, and wind energy. In operating
LandsvirkjunPublished 8 Sept 2025Closes Not listed The tender consist of: Control system: Design, manufacture, test, delivery and installation,including commissioning for the renewal of the power plant control system and water level control system. The renewed system includes all necessary components, hardware, software and progr
LandsvirkjunPublished 1 Sept 2025Closes Not listed The tender consist of: Control system: Design, manufacture, test, delivery and installation,including commissioning for the renewal of the power plant control system and water level control system. The renewed system includes all necessary components, hardware, software and progr
TED
LandsvirkjunPublished 23 Aug 2025Closes 30 Sept 2025 Landsvirkjun (the Authority) is Iceland’s largest electricity generator, with 18 power stations all over Iceland. The Authority produces 70% of all electricity in Iceland, from 100% renewable energy resources: hydroelectric energy, geothermal energy, and wind energy. In operating
TED
LandsvirkjunPublished 23 Aug 2025Closes 25 Aug 2025 Landsvirkjun, the Buyer, requests tenders for 51 units of switchgears. The Buyer reserves the right to buy 21 units of switchgears with with a decision on purchases in August of each year. See further information in tender documents.
TED
LandsvirkjunPublished 13 Aug 2025Closes 16 Sept 2025 Landsvirkjun (the Authority) is Iceland’s largest electricity generator, with 18 power stations all over Iceland. The Authority produces 70% of all electricity in Iceland, from 100% renewable energy resources: hydroelectric energy, geothermal energy, and wind energy. In operating