Sultartangi Power Station - Enlargement of the headrace tunnel cross-section
Sign in to run fit scoring, collaborate with your team, and attach supporting documents. Subscriptions keep this tender and similar ones in sync with your capability folders.
Summary
It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in length. The existing tunnel has an elliptical crosssection with an approximate area of 152 m². The proposed enlargement involves lowering the tunnel invert by 4.5 m below the existing level. The estimated excavation volume is approximately 124,000 m³ measured in solid rock (in situ).