Racks for SFRS and NUSTAR
19"-Racks, die als standardisiertes Gehäuse für diverse 19"-Rack montierbare elektronische Systeme wie VME-, µTCA-, NIM- und Hochspannungs-Crates und - Module dienen.
Use this page to review recent public tenders from FAIR - Facility for Antiproton and Ion Research in Europe GmbH, see how active this buyer is, and open the underlying notice pages in Tenqual.
Recent notices from this buyer are listed below when available.
19"-Racks, die als standardisiertes Gehäuse für diverse 19"-Rack montierbare elektronische Systeme wie VME-, µTCA-, NIM- und Hochspannungs-Crates und - Module dienen.
Gegenstand der auszuschreibenden Rahmenvertragsleistung sind die vergabe-, vertrags- und zuwendungsrechtlichen Beratungsleistungen für den "Neubau des Beschleunigerzentrums Facility for Antiproton and Ion Research (FAIR)" in Darmstadt. Der Rahmenvertrag des bisher tätigen Auftrag
This tender covers the procurement of Beam Pipes and Adapter Pipes with respect to the Detailed Specification (F-DS-SFR-en-VC_0114_Beam_pipes_Adapter_flanges_SFRS-V001). Point 3.2.2. OPTIONAL COMPONENTS FOR FIRST SCIENCE PHASE (EXPANSION) is excluded from this tender
In the basement of building K308A, the High Energy Cave (HEC), part of the FAIR facility, a storage lift system is required for storing construction and spare parts, tools, and other work materials. This lift is to be delivered, assembled, and commissioned by the contractor.
Due to the expected amount of activity in the exhaust air, FAIR will be required in the future to operate an exhaust air measurement system that specifies the composition and activity of the discharge.
Production of metal plates for use at FAIR in Darmstadt for level compensation of machines.
Für den gemeinsamen Betrieb von FAIR und GSI wird ein leistungsstarkes, zuverlässiges und flexibles CAFM-System als Verhandlungsverfahren mit Teilnahmewettbewerb ausgeschrieben (Computer-Aided Facility Management). Das System sammelt und strukturiert die zugehörigen Daten der Imm
Development, production and delivery of specialised electronic software and few hardware for the control, data acquisition and monitoring of the accelerators. All these components need full software integration into the FAIR accelerator control system. Further, the services inclu
The High Energy Beam Transport (HEBT) system of the FAIR facility enables the transfer of ion, proton and antiproton beams between the synchrotron and storage rings, to and from Super-FRS, to the antiproton production target and separator, and to the experimental areas. A large n
Design, Development, engineering, manufacturing, shipment, installation and testing of an Anti-Cryostat set-up for application in magnetic field measurement of SIS100-Quadrupole Units at the magnet test facility at FAIR.
Development, production and delivery of specialised electronic software and few hardware for the control, data acquisition and monitoring of the accelerators. All these components need full software integration into the FAIR accelerator control system. Further, the services inclu
External consulting services provided by a magnet expert
Expert in on-site production supervision for cryogenic systems, engineering and inspection of steel welds and brazings within large scale projects of research institutes. Support and forward-looking monitoring of suppliers on site in France throughout the entire course of the pro
External consulting services provided by a magnet expert
The aim of the tender is to award a contract to advise the joint management of FAIR and GSI on the future structure and operational organization of both companies. The consulting is intended to analyze the existing organizational structure, systematically show its strengths and w
The Facility for Antiproton and Ion Research (FAIR) will be one of the leading-edge particle accelerator facilities for basic research as well as applied science experiments. The FAIR project is an international collaboration of 16 partner organisations. The project is currently
Expert in on-site production supervision for cryogenic systems, engineering and inspection of steel welds and brazings within large scale projects of research institutes. Support and forward-looking monitoring of suppliers on site in France throughout the entire course of the pro
Expert in on-site production supervision for cryogenic systems, engineering and inspection of steel welds and brazings within large scale projects of research institutes. Support and forward-looking monitoring of suppliers on site in France throughout the entire course of the pro
The shielding concrete beams are needed as crucial infrastructure of the CBM Cave as they provide mounting positions for detectors and other infrastructure. They also act as cover for the electronics and control systems of the experiment and shield these components from high dose
2 types of Gate Valve-Inflatable Bellow Structure + support frames, 3 pieces of each
The Plastic Scintillators detectors are part of the timing system of the Super-FRS. They will be used to provide the timing signals of the travelling ion beams. Being fast enough to allow for triggering, they will be used for performing in-beam (time) calibration of other Super-F
A new international scientific research centre facility FAIR (Facility for Antiprotons and Ion Research) is under constructed next to the existing GSI Helmholtz Centre for Heavy Ion Research. FAIR will provide antiproton and ion beams of unprecedented intensity and quality. One o
In total two frames around a beam catcher chamber need to be filled. Each one contains about 100 plates of 100mm thickness. The shape must be cut to fit around a tube (d = 300mm) running inside the frame. There are around 14 different shapes. The total mass er frame is about 21 t
In total two frames around a beam catcher chamber need to be filled. Each one contains about 100 plates of 100mm thickness. The shape must be cut to fit around a tube (d = 300mm) running inside the frame. There are around 14 different shapes. The total mass er frame is about 21 t
The HEBT charge stripper, that is to be procured with this tender, is a device designed to strip electrons from beam ions in order to produce ion beams with defined charge states for FAIR. This device will be positioned behind the heavy ion synchrotron SIS18, in the first beamlin