FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3
Purchaser
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Country
—
Published
21 Aug 2025
Closing date
6 Aug 2025
Source ID
Docs found
—
Unlock fit scoring for this notice, save it to your pipeline, and find similar public-sector opportunities that match your capabilities.
- See whether this tender is worth pursuing.
- Keep this notice and your bid workflow in one workspace.
- Track similar tenders without rebuilding the search manually.
Summary
A new international scientific research centre facility FAIR (Facility for Antiprotons and Ion Research) is under constructed next to the existing GSI Helmholtz Centre for Heavy Ion Research. FAIR will provide antiproton and ion beams of unprecedented intensity and quality. One of the essential parts of FAIR will be the Heavy Ion Synchrotron (SIS)100. High current Extraction Septa 2 and 3 magnets are components of the SIS100, which will be powered by 2 power converters. The current in the magnets must be ramped up to 13000 A with an absolute accuracy of 100 ppm. The maximum output voltage is of up to 100V. These power converters will be feed by 20kV supply system. In Table 4.1 of the Detailed Specification, ANNEX 3, the specified maximum available installation space for the power converters is to be understood as a preliminary guideline. Deviations from this requirement may be acceptable under certain circumstances and can be discussed during the negotiation phase, if necessary.
Sign in to run AI fit scoring, bid/no bid reviews, and compliance drafting for this tender.