Back to search
SAM.govNotice b487a7c55e4a45c69263dc38fd4acbdd

SSRL B116 & B132 BPM HVAC Replacement

Country
United States
Published
March 31, 2026
Deadline
April 13, 2026

Description

{"description":" The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. \nAll construction activities must be performed primarily during SSRL’s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. \n\n \n\n NOTE: The SOW is currently being revised, and I expect to upload an updated version to this posting this week. The site walk has been POSTPONED and is currently TBD; I will notify all interested vendors once the date is confirmed. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
SSRL B116 & B132 BPM HVAC Replacement tender | Tenqual