Back to search
SAM.govNotice a442187093f144308f1dd4cf57ba5f2b

SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

Country
United States
Published
April 29, 2026
Deadline
May 14, 2026

Description

{"description":" THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE \n\n \n\n PROJECT NUMBER: SD FTFW MADI 10(2) & 9000(1) \n\n PROJECT NAME: REHAB MADISON WMD HQ ROAD \n\n PROJECT DESCRIPTION : \n\n The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces. \n\n \n\n SCOPE OF THE WORK: \n\n The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74. \n\n \n\n The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break. \n\n \n\n PRINCIPAL WORK ITEMS: \n\n \n\t 20401-0000 Roadway Excavation: 550 CUYD \n\t 20402-0000 Subexcavation: 200 CUYD \n\t 30202-2000 Roadway Aggregate, Method 2: 600 TON \n\t 40301-0000 Asphalt Concrete Pavement, 500 TON \n \n\n \n\n ANTICIPATED SCHEDULE: \n\n Advertisement – May 2026 \n\n Award – July 2026 \n\n NTP – July 2026 \n\n Contract Completion – October 2026 \n\n \n\n ESTIMATED COST RANGE : Total estimated cost between $501,000 and $1,000,000. \n\n \n\n \n"} Solicitation Number: 6982AF26B000008 Type: Presolicitation Base Type: Presolicitation NAICS: 237310 Classification Code: Y1LB Response Deadline: 2026-05-14T14:00:00-04:00 Office Address: LAKEWOOD, CO Place of Performance: South Dakota, 57042 POC: Douglas Whitcomb, cflacquisitions@dot.gov POC: Jorey Deml, cflcontracts@dot.gov

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD tender | Tenqual