Back to search
SAM.govNotice 827e488087434cf4a56571a696df0e9e

Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing

Country
United States
Published
December 19, 2025
Deadline
January 13, 2026

Description

{"description":" The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete. \n\n NOTICE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”. \n\n \n\n 19 December 2025 - Organized pre-bid site visit conducted on 17 December 2025. Contracting discussion and site visit sign in posted. \n"} Solicitation Number: W911WN26BA003 Type: Solicitation Base Type: Solicitation NAICS: 238990 Classification Code: Z2KA Response Deadline: 2026-01-13T11:00:00-05:00 Office Address: PITTSBURGH, PA Place of Performance: Wheeling, West Virginia, 26003 POC: Aaron Barr, aaron.m.barr@usace.army.mil, 4123957157 POC: Connie L. Ferguson, Connie.L.Ferguson@usace.army.mil, 4123957551 {"description":" The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete. \n\n NOTICE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”. \n\n \n\n 19 December 2025 - Organized pre-bid site visit conducted on 17 December 2025. Contracting discussion and site visit sign in posted. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing tender | Tenqual