Back to search
GETSNotice https://www.gets.govt.nz//HCC/ExternalTenderDetails.htm?id=32146779

Ava Rail Bridge Shared Use Path Replacement ECI

Buyer
Hutt City Council
Country
New Zealand
Published
July 28, 2025
Deadline
August 15, 2025

Description

RFx ID: 32146779 Organisation: Hutt City Council Open date: Monday, 28 July 2025 12:00 PM +12:00 Close date: Friday, 15 August 2025 2:00 PM +12:00 Categories: 72000000 - Building and Facility Construction and Maintenance Services 81000000 - Engineering and Research and Technology Based Services 95000000 - Land and Buildings and Structures and Thoroughfares Region: Wellington Overview: HCC is seeking to engage a qualified and experienced contractor to deliver Early Contractor Involvement (ECI) services followed by physical construction of the Ava Rail Bridge Shared Use Path Replacement project. The project involves replacing an ageing pedestrian structure with a new, safe, and accessible shared use path clip-on alongside the Ava Rail Bridge — a key link in Lower Hutt’s active transport network. The successful Respondent will work collaboratively with HCC, the appointed design consultant, and Quantity Surveyor (QS) during the ECI phase to provide input on construction methodology, staging, buildability, risk management, and cost validation. Following the completion of the design and consenting phase, the Respondent will then deliver the full construction works, with a target construction start date of January 2026 HCC is seeking to engage a qualified and experienced contractor to deliver Early Contractor Involvement (ECI) services followed by physical construction of the Ava Rail Bridge Shared Use Path Replacement project. The project involves replacing an ageing pedestrian structure with a new, safe, and accessible shared use path clip-on alongside the Ava Rail Bridge — a key link in Lower Hutt’s active transport network. The successful Respondent will work collaboratively with HCC, the appointed design consultant, and Quantity Surveyor (QS) during the ECI phase to provide input on construction methodology, staging, buildability, risk management, and cost validation. Following the completion of the design and consenting phase, the Respondent will then deliver the full construction works, with a target construction start date of January 2026

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Ava Rail Bridge Shared Use Path Replacement ECI tender | Tenqual