Back to search
GETSNotice https://www.gets.govt.nz//MEDUR/ExternalTenderDetails.htm?id=31829775

Main Contractor for Refurbishment of Universal bathroom at Korokoro School (Wellington)

Buyer
Ministry of Education - School Infrastructure
Country
New Zealand
Published
June 11, 2025

Description

RFx ID: 31829775 Organisation: Ministry of Education - School Infrastructure Open date: Thursday, 12 June 2025 9:00 AM +12:00 Close date: Tuesday, 8 July 2025 5:00 PM +12:00 Categories: 72000000 - Building and Facility Construction and Maintenance Services Region: Wellington Overview: The BOT at Korokjoro School are seeking the services of a main contractor to undertake the construction works to upgrade an accessible bathroom to make it a fully universal bathroom in Block A. Outcome sought: A new MOE standard universal bathroom for the school in block A • History: A student transitioned to Korokoro School as a Year 1 student in 2024. The student requires a full accessible bathroom in order to attend school. Adjacent female and male student bathrooms with also be constructed upon. • Overview of the programme of which this project is a part: The project is due to be tendered in June 2025 for delivery in July. • Requirements for phasing and / or staged handover of the project: Phasing or staging may be required to allow universal bathroom access initially while male and female bathrooms are completed. TBC once the contractors programme is reviewed. The Contract Works required are: i. Nature of the Works : Demolition of existing internal walls separating central accessible bathroom to extend footprint of new accessible bathroom. Make good to male and female bathrooms either side of new bathroom. Reconstruction of external windows as required with new internal layout. ii. Size/scale: The size of the project works is limited to the three existing bathroom spaces in block A. iii. Description of the site including conditions, known constraints: (a) Asbestos Refurbishment Survey undertaken, no asbestos was found after intrusive testing. (b) Existing condition of concrete floor in not level throughout. This will be adjusted in construction works. (c) The existing lobbies to the female and male toilets were once external so claddings and windows will be adjusted as required for new construction The project Consultants are: - Project Manager: Milla Saris - Lead Designer: Paul Terpstra

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Main Contractor for Refurbishment of Universal bathroom at Korokoro School (Wellington) tender | Tenqual