Back to search
SAM.govNotice c4d3d469e92d4a359f00d90a164854ad

Office Repairs for Hastings, MN

Country
United States
Published
March 4, 2026
Deadline
March 19, 2026

Description

{"description":" Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details) \n\n \n\n The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a �? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs. \n"} Solicitation Number: W912ES26QA030 Type: Solicitation Base Type: Solicitation NAICS: 238310 Classification Code: Z2AA Response Deadline: 2026-03-19T15:00:00-05:00 Office Address: SAINT PAUL, MN Place of Performance: Hastings, Minnesota, 55033 POC: Justin Rose, JUSTIN.H.ROSE@USACE.ARMY.MIL, 6512905422 {"description":" Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details) \n\n \n\n The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a �? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Office Repairs for Hastings, MN tender | Tenqual