Back to search
CanadaBuysNotice cb-539-67189676

Phase 2 – Réparation du pont de la rivière Spruce et du ponceau du ruisseau Bear - Parc national de Prince Albert

Buyer
Parks Canada Agency (PC)
Country
Canada
Published
July 6, 2025
Deadline
July 22, 2025

Description

5P468-25-0038/A Stage 2 - Spruce River Bridge and Bear Creek Culvert Repairs – Prince Albert National Park REQUIREMENT Parks Canada requires renovations to Spruce River Bridge and Bear Trap Road Culvert. Work at Spruce River Bridge work consists of timber bridge replacement of existing timber bracing on in-water pier, supply and installation of new timber members at abutments and in-water pier, and localized roadway patch repair including asphalt and new timber retaining planks. Work at Bear Trap Road Culvert includes replacement of timber headwall planks, supply and installation of timber piles, supply and installation of pile tie-back assemblies, associated earthworks including excavation and backfill, and supply and installation of W-beam guardrail. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Phase 2 – Réparation du pont de la rivière Spruce et du ponceau du ruisseau Bear - Parc national de Prince Albert tender | Tenqual