New 22 kV cable for a computer centre, Ringerike
- Buyer
- Føie AS
- Published
- December 23, 2025
Description
Føie AS shall, upon request from customers Green Mountain and hScale, establish redundant high voltage supply for the two that are established in cooperation between the parties. The main section from Follum Transformer Station shall ensure both Green Mountain and hScale double supply with a total capacity of 40 MW of installed power each. A total of four main supplies shall be delivered: One supply line consists of 4 3x630 AL triangular cables + 50mm CU accompanying soil. All 4 main supplies are to be put in a common ditch up to GM's property, where two of the supplies are terminated at GM's distribution station. The remaining 2 supplies will be transported to hScales property and terminated at the distribution station at Follummoveien. Æge Energy has designed and planned high voltage routes with associated profiles. Hallingconsult has ensured a quarter concession and building permit. The work shall be carried out as a turnkey contract NS 8407.
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.