Back to search
SAM.govNotice 87f11f2cd3b94631aa708a3d2c1b93ec

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Country
United States
Published
December 18, 2025
Deadline
February 18, 2026

Description

{"description":" Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be constructed within the grounds of CCSFS in facilities which are in restricted areas requiring enhanced security protocols. The impacted facilities are to remain occupied throughout construction with minimal disruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery energy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all facility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid controls, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered generators, uninterrupted power supplies, critical and non-critical power distribution resources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mission critical operations and impacted protective HEMP barriers. \n"} Solicitation Number: W912WJ26RA003 Type: Solicitation Base Type: Solicitation NAICS: 237130 Classification Code: Y1QA Response Deadline: 2026-02-18T13:00:00-05:00 Office Address: CONCORD, MA Place of Performance: Bourne, Massachusetts POC: Tyler Maryak, tyler.s.maryak@usace.army.mil, 9783188049 POC: Erin Bradley, erin.e.bradley@usace.army.mil {"description":" Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be constructed within the grounds of CCSFS in facilities which are in restricted areas requiring enhanced security protocols. The impacted facilities are to remain occupied throughout construction with minimal disruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery energy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all facility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid controls, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered generators, uninterrupted power supplies, critical and non-critical power distribution resources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mission critical operations and impacted protective HEMP barriers. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA tender | Tenqual