Back to search
SAM.govNotice a6f4788a646c429ebabb0a5d84aa738a

NIST Boulder Building 2 1330 Fume Hood Replacement

Country
United States
Published
March 4, 2026
Deadline
March 18, 2026

Description

{"description":" The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated period of performance is approximately six months from the date of award. \n"} Solicitation Number: NB196000-26-00864 Type: Sources Sought Base Type: Sources Sought NAICS: 236220 Classification Code: Z2AA Response Deadline: 2026-03-18T17:00:00-06:00 Office Address: GAITHERSBURG, MD Place of Performance: Boulder, Colorado, 80305 POC: Lauren Lopez, lauren.lopez@nist.gov POC: Travis Zoellner, travis.zoellner@nist.gov {"description":" The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated period of performance is approximately six months from the date of award. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
NIST Boulder Building 2 1330 Fume Hood Replacement tender | Tenqual