Back to search
SAM.govNotice 8d227744c2ea42b78d5984c16cbf86d4

Electrical Work at the Bridger Plant Materials Center, Bridger, Montana

Country
United States
Published
February 17, 2026
Deadline
March 3, 2026

Description

{"description":" \n\n Please see Attaachment 1 Statement of Work for further detailed description of services. \n\n This work is for the United States Department of Agriculture - Natural Resources Conservation \nService (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT \n59014-9718. The work is to run three-phase power from the main distribution panel to a subpanel, to \npower an existing outlet for charging a forklift and to install a new connection for the new \nwalk-in seed cooler. \nThe Contractor shall: \n\n Install conduit on the exterior of the building from the main distribution panel (MDP) unit to the \ninterior wall behind the walk-in cooler, an approximate distance of 65 feet (from the 100amp panel \nto the disconnect of the cooler is a total of 25 feet). The exterior wall is tin with insulation \nand osb/plywood; interior walls are tin with insulation. Install a 100amp three-phase service feed \nfrom the MDP to a new 100amp three-phase panel located next to the existing electric forklift \nreceptacle. Conduit raceway will be metal EMT and Wire conductors will be copper THHN. \nRemove the forklift breaker from the outdoor MDP and install a new 100amp Three Phase breaker in \nplace. Re-feed the forklift disconnect out of the new 100amp sub panel to the existing forklift \nreceptable, installing new solid conduit, wiring, and receptacle if required. Subpanel is 3 feet \nfrom the forklift. \n\n Provide for electrical wiring of the Walk-in Cooler. Install a surface mount conduit from the new \nThree Phase sub panel to the Walk-in Cooler area. Install a service disconnect switch for the \nWalk-in \nCooler. Wire from the service disconnect to the already pre-wired control panel located on the \n\n Walk-in Cooler. Note: Start up and testing of the Walk-in Cooler to be done by a separate HVAC \nContractor provided by the owner. \nDispose or recycle all materials removed from the site. Clean all spaces associated with the work. \n\n Timely completion of deliverables is essential to a successful outcome. All work must be completed \nwithin 30 calendar days of the contract being awarded. \nAll the materials and work required and performed by the contractors must be warrantied for one \nyear \nfrom the date of completion of the project. \n \n"} Solicitation Number: 12FPC326Q0002 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 238210 Classification Code: N059 Response Deadline: 2026-03-03T15:00:00-05:00 Office Address: WASHINGTON, DC Place of Performance: Bridger, Montana, 59014 POC: Mark Domingo, mark.domingo@usda.gov {"description":" \n\n Please see Attaachment 1 Statement of Work for further detailed description of services. \n\n This work is for the United States Department of Agriculture - Natural Resources Conservation \nService (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT \n59014-9718. The work is to run three-phase power from the main distribution panel to a subpanel, to \npower an existing outlet for charging a forklift and to install a new connection for the new \nwalk-in seed cooler. \nThe Contractor shall: \n\n Install conduit on the exterior of the building from the main distribution panel (MDP) unit to the \ninterior wall behind the walk-in cooler, an approximate distance of 65 feet (from the 100amp panel \nto the disconnect of the cooler is a total of 25 feet). The exterior wall is tin with insulation \nand osb/plywood; interior walls are tin with insulation. Install a 100amp three-phase service feed \nfrom the MDP to a new 100amp three-phase panel located next to the existing electric forklift \nreceptacle. Conduit raceway will be metal EMT and Wire conductors will be copper THHN. \nRemove the forklift breaker from the outdoor MDP and install a new 100amp Three Phase breaker in \nplace. Re-feed the forklift disconnect out of the new 100amp sub panel to the existing forklift \nreceptable, installing new solid conduit, wiring, and receptacle if required. Subpanel is 3 feet \nfrom the forklift. \n\n Provide for electrical wiring of the Walk-in Cooler. Install a surface mount conduit from the new \nThree Phase sub panel to the Walk-in Cooler area. Install a service disconnect switch for the \nWalk-in \nCooler. Wire from the service disconnect to the already pre-wired control panel located on the \n\n Walk-in Cooler. Note: Start up and testing of the Walk-in Cooler to be done by a separate HVAC \nContractor provided by the owner. \nDispose or recycle all materials removed from the site. Clean all spaces associated with the work. \n\n Timely completion of deliverables is essential to a successful outcome. All work must be completed \nwithin 30 calendar days of the contract being awarded. \nAll the materials and work required and performed by the contractors must be warrantied for one \nyear \nfrom the date of completion of the project. \n \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Electrical Work at the Bridger Plant Materials Center, Bridger, Montana tender | Tenqual