Back to search
SAM.govNotice 4e91fbee8da542d0b38ac6051e523cfd

Floor Maintenance and Re-surfacing

Country
United States
Published
January 16, 2026
Deadline
January 23, 2026

Description

{"description":" Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor’s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination. \n"} Solicitation Number: 36C26226Q0051_1 Type: Solicitation Base Type: Solicitation NAICS: 561720 Classification Code: S201 Response Deadline: 2026-01-23T15:00:00-07:00 Office Address: Gilbert, AZ Place of Performance: Arizona, 85012 POC: Jasmon Cornick, jasmon.cornick@va.gov, 4804667924 {"description":" Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor’s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Floor Maintenance and Re-surfacing tender | Tenqual