Back to search
SAM.govNotice 8de334c2c81b473796c45f9e8c3e12c2

403873 FLW AIT Barracks Complex II Phase 2

Country
United States
Published
November 4, 2025
Deadline
December 4, 2025

Description

{"description":" ****Update Nov 3, 2025**** Amendment 0003 extends the due date to Dec 4, 2025 while potential changes to the Div 00 specifications are developed \n\n ****Update Oct 28, 2025**** Amendment 0002 provides answers to PROJNET questions and related specs and drawings \n\n ****Update Oct23, 2025**** PROJNET questions answered and proposal due date extended to Nov6 2025 @11:00CsT \n\n The US Army has a requirement to construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures. Pay close attention to the Site Visit and Bidder Inquiry information located in the Solicitation. All drawings are located online in the PROJENT file by using the Plan Room Key \n"} Solicitation Number: W912DQ25RA004 Type: Solicitation Base Type: Solicitation NAICS: 236220 Classification Code: Y1FC Response Deadline: 2025-12-04T11:00:00-06:00 Office Address: KANSAS CITY, MO Place of Performance: Fort Leonard Wood, Missouri, 65473 POC: Dale Coleman, dale.e.coleman@usace.army.mil, 816 389 3500 POC: Michael G. France , michael.g.france@usace.army.mil, 816 389 3320 {"description":" ****Update Nov 3, 2025**** Amendment 0003 extends the due date to Dec 4, 2025 while potential changes to the Div 00 specifications are developed \n\n ****Update Oct 28, 2025**** Amendment 0002 provides answers to PROJNET questions and related specs and drawings \n\n ****Update Oct23, 2025**** PROJNET questions answered and proposal due date extended to Nov6 2025 @11:00CsT \n\n The US Army has a requirement to construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures. Pay close attention to the Site Visit and Bidder Inquiry information located in the Solicitation. All drawings are located online in the PROJENT file by using the Plan Room Key \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
403873 FLW AIT Barracks Complex II Phase 2 tender | Tenqual