Back to search
SAM.govNotice 987e450520d54cdca669e1cf0649e7b9

C1DA--AE Replace Security Cameras 610-25-213

Country
United States
Published
January 26, 2026
Deadline
November 12, 2025

Description

{"description":"The Previous Notice is being modified to reflect a change in the NAICS Code to 541330.\nSTATEMENT OF WORK\nThe Architect/Engineer (A/E) firm shall provide professional services for 100% design to replace all existing security cameras and add additional cameras throughout the VA Northern Indiana Health Care System, Marion Campus, located at 1700 E. 38th Street, Marion, IN 46953. The design will include Schematic Design, Design Development, Construction/Bid Documents in accordance with the A/E Design Submission Instructions Document, Construction Administration Services, Technical Specifications, and Cost Estimates. The replacement of all security cameras shall be designed to accommodate the following functions based on the guides, manuals, and planning criteria:\n\nReplace Cameras\nCompatible with the current Electronic Security System:\nIP Addressable:\nAC Powered:\nWithstanding extreme temperatures:\n\nNew Cameras\nCompatible with the current Electronic Security System:\nIP Addressable:\nAC Powered:\nWithstanding extreme temperatures:\n\nSpecial items to consider for this project:\nLocations of IT closets and electrical closets should be identified for access to the security network. \nMeans of getting access to the camera locations.\nA/E firm will provide details of each camera location.\n\nThe Schematic Design shall include a comprehensive study, inspection, and report of the existing project area conditions, which shall include HVAC, electrical, architectural components, plumbing, site locations, etc. \n\nA/E shall develop a design and plan to replace the existing cameras and make all necessary upgrades for power and network connections. \n\nA/E shall develop a plan and design to add additional cameras per security requirements.\n\nA/E shall provide a preliminary construction duration time for planning purposes. This information shall be communicated to all bidders for their review and inclusion within their bids. It shall be communicated within the bid documents that the contractor will be required to review and provide any concerns regarding the projected construction duration.\n\nA/E shall develop and provide a schedule of equipment necessary to activate and operate the systems located in the project area. \n\nA/E will be responsible for the complete functional design and providing biddable documents that meet all the requirements. The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management. It is the master repository for all VA Numbered Standards for Construction, including design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, physical security and resiliency, and design guides. The documents of the TIL shall serve as the minimum design criteria for all VA projects, including the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. \n\nVA additionally, through the documents on the TIL, has adopted the latest edition of the following codes and standards (but not limited to): \n\nOccupational, Safety and Health Administration (OSHA) Standards\nInternational Building Code (IBC)\nNational Electrical Code (NEC)\nNFPA 101 Life Safety Code\nNational Fire Protection Association (NFPA) Codes, except for NFPA 5000 and NFPA 900\nNational Standard Plumbing Code (NSPC)\nSafety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1\nASME Boiler and Pressure Vessel Code\nASME Code for Pressure Piping\nInternational Plumbing Code (IPC)\nArchitectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities\nBuilding Code Requirements for Reinforced Concrete, American Concrete Institute (ACI 318 2) and Commentary (ACI 318 R2)\nManual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)\nEnergy Policy Act of 2005 (EPAct)Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1\nDOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial, and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434, and 435\nFederal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)\nExecutive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management\nThe Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification\nVentilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1\nSafety Standard for Refrigeration Systems ASHRAE Standard 15\nU.S. National CAD Standard\n\nWhere conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department-wide.\n\nDesigns for construction must produce a complete and usable facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. Additionally, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately, unless directed otherwise by the VA. Equipment that can be part of the design includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.\n\nThe A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence.\n\nThe project is to provide all necessary modifications and additions to the VA NIHCS existing building structure, mechanical, electrical, and plumbing work. \n\nA/E shall be responsible for reviewing existing conditions at locations planned for development. Existing drawings of Buildings are on file at the VA NIHCS for review by the A/E. Access to files shall be coordinated with the COR. \n\nThe AE will employ a commissioning agent to certify that the design and construction meet Federal Mandates. The commissioning authority will verify the performance of the components and systems and, to ensure design requirements are met, develop a commissioning plan, including commissioning or requirements in construction documents, verification of installation and performance of commissioned systems (testing and system monitoring), operation/maintenance manuals and training, and a commissioning report. The A/E team shall work with the commissioning agent throughout the design and construction process to ensure all sustainable objectives are met. \n\nThe AE will employ a third-party construction cost estimator. The cost estimator is to be a separate, independent, unbiased, and non-affiliated entity subcontracted by the A/E. The A/E may not use their own personnel to complete any requirements stated within the Cost Manual. \n\nAll drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD), which are available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2020 or the latest version available to VA NIHCS, Marion Campus.\n\nThe project BIM model minimum requirements shall be developed to include the systems described below, as they would be built, the processes of installing them, and to reflect record drawing conditions (possibly incorporating into the Marion VAMC Master Record Drawing pending facility expertise). The deliverable model at the DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.\n\nArchitectural/Interior Design\nSquare Footage/Volume including Room Names and Numbers\nDepartmental Ownership\n(By Common Name, Capital Asset Inventory Department Definition, and Strategic Capital Investment Program Department Definition)\nArchitectural Schedules\nWalls and Curtain Wall Sizes, Shapes, and Material Data\nDoors\nWindows\nLouvers\nRoof\nFloors\nCeilings\nVertical Circulation\nArchitectural Specialties and Woodwork\nLife Safety Information\n(Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)\nGeneral Signage\nSchedules\nFurniture\nEquipment\nStructural\nFoundations\nShafts and Pits\nMechanical\nHVAC\nPlumbing\nElectrical/Telecommunications\nPower and Lighting\nSteam Distribution\nNurse Call System\nAsbestos/ Hazard Material Info\nSecurity System Information\n(Access Controls, Security Cameras, Panic Alarms, Overhead Paging)\nExterior Building Information\n3D Model Renderings\nOther Engineering Data as Required\n\nA/E shall develop a phasing plan and develop a deduct bid alternate for the project award, which will be based on available funding for the construction of $812,000.\n\nGENERAL\n\nThe VA NIHCS offices of Engineering Service and VISN Contracting will give the A/E the appropriate orientation. The A/E shall prepare all necessary drawings. The degree of completion and the stages of submission are specified as follows. The VA NIHCS will provide all standard details, master specifications, design criteria, etc. \n\nA/E discussion with the VA NIHCS personnel concerning requirements will be arranged by and participated in by appropriate Engineering Service personnel. The A/E shall participate with the Project Engineering and other Services in the review of project scope, design review comments, etc.\n\nThere will be (1) submissions for schematic design drawings, and one (1) submission for design development drawings, (3) three submissions for construction documents (95% and 100% complete) plus a final submission which constitutes a complete bid package consisting of drawings, specifications, detailed final cost estimates, phasing and sequence drawings within each phase, and project bid alternates.\n\nDrawings showing architectural and other features of the affected system/building are available in files of the Engineering Service, VA NIHCS. The drawings are not to be expected to be accurate in all respects, and the Architect-Engineer is to verify all features affecting the project by field investigation.\n\nThe A/E shall develop the project utilizing Revit 2020 and Building Information Modeling (BIM) to develop architectural design drawings, renderings, construction documents, and record drawings at completion of construction as per the VA BIM guide located on the VA Technical Information Library (TIL). At each scheduled submittal date, the A/E shall submit to the VA a list of the submitted files that shall include 3D Views, Facility Data, and Revit Data Files. Submittal drawings shall be full-size plots suitable for half-size reproduction.\n\nThe VA has ownership of the rights at the date of Closeout Submittal to all CAD files, Revit 2020 BIM Model, and Facility Data developed for the Project. The VA may make use of this data following any deliverables.\n\nFor preparation of construction specifications, the A/E will provide specifications in \"Word\" format and PDF format. The A/E shall supply copies of the specification files, combined into a single document, to be electronically transported to the CO for incorporation into the VA specification booklet.\n\nSchedule & Submission Requirements \nTimes listed herein are approximate and subject to negotiation. Each milestone in the timeline is subject to completion of the predecessor task and project requirements external to the AE scope; as such, calendar days for task completion shall be negotiated instead of actual dates. \n\nThe following is an estimated milestone schedule in terms of business days. Federal holidays do not count as business days.\nActivity\nLevel of Completion\nCalendar Days\n\nSchematic Submission (SC)\n35%\n30\nAfter Notice to Proceed\nVA Review of 35% (SC)\n\n14\nAfter Receipt of 35% Submission\nDesign Development Submission (DD)\n65%\n33\nAfter VA Approval of 35% SC Submission\nVA Review of 65% (DD)\n\n14\nAfter Receipt of 65% Submission\nConstruction Document Submission (CD)\n95%\n30\nAfter VA Approval of 65% DD Submission\nVA Review of 95% (CD)\n\n14\nAfter Receipt of 95% Submission\nConstruction Document Bid Set Submission (CDBS)\n100%\n24\nAfter VA Approval of 95% CD Submission\nVA Review of 100% CDBS\n\n14\nAfter Receipt of 100% CDBS Submission \nDeliver Final Construction Document Bid Set\n\n7\nAfter VA Approval of 100% CDBS Submission\n\n\n\n\n\n\n124\nA/E Design\n\n\n56\nVA Review\n\n\n180\nTotal Design Timeframe\n\nThe design schedule is 180 days to complete Schematic Design, Design Development, Construction Documents, Technical Specifications, and Cost Estimates for Construction. Completion of Construction Administration Services will not be dependent upon the award of the Construction Contract.\nConstruction Period Services\nContract Procurement\nAttend the contractor s Pre-Bid site visit and respond with recommendations to any questionable items. If necessary, develop amendments or assist with project procurement. A written response is required. \nSubmittal Review\nThe A/E firm shall review all construction materials, equipment, and change orders proposed by the contractor for use in the construction of this project. All submittals and change order proposals will be reviewed for compliance with the specifications and reasonable costs and returned to Engineering Service within five (5) calendar days after receipt. \n\nSite Visits\nThe A/E shall provide site visits as requested by the COR as noted below:\nOne (1) visit for the pre-bid conference. \nZero (0) visit for the pre-construction conference. \nEight (4) visits for general construction inspection/progress. \nTwo (2) visits for final inspections.\nA/E to provide other construction phase services as defined in the signed contract. \nMisc. \nThe A/E shall review and answer all RFI s submitted by the contractor and returned to Engineering Service within five (5) calendar days after receipt. \nA/E to participate in weekly telephonic project meetings with the VA and contractor. \nAs-Built Drawings\nThe A/E shall modify design drawings and models based on marked drawings supplied by the contractor, and these modifications are to be verified by the A/E in the field. As-Builts are to include all addenda and bulletins issued by the VA/AE during construction. These changes shall be bubbled and dated. An electronic Revit BIM 2020 and AutoCAD 2020 model of the As-Builts is to be submitted to the COR on CD-ROM. Any approved shop drawings with major differences from contract drawings, supplemental agreements, processed change orders, etc., shall be incorporated. The A/E shall deliver updated record drawings (4 sets): (2) ½ size sets, (2) full-size sets.\nSELECTION CRITERIA:\n\nProfessional qualifications necessary for satisfactory performance of required services.\nSpecialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.\nCapacity to accomplish the work in the required time.\nPast performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.\nLocation in the general geographical area of the project and knowledge of the locality of the project; provided that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project.\n\nExperience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.\nThe extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors.\nSUBMITTAL INSTRUCTIONS:\nAll interested and capable firms are to submit an electronic SF330 package for review. Physical copies will not be accepted. SF330s can be submitted to the following email address:\nElizabeth.Finley1@va.gov\nThe package must be received and under government control NLT 11/12/2025 at 10:00 A.M. EST.\n\n***END OF ANNOUNCEMENT***\n\n"} Solicitation Number: 36C25026R0010 Type: Presolicitation Base Type: Presolicitation NAICS: 541330 Classification Code: C1DA Response Deadline: 2025-11-12T10:00:00-05:00 Office Address: DAYTON, OH Place of Performance: Marion, Indiana, 46953 POC: Elizabeth Finley, Elizabeth.Finley1@va.gov {"description":"The Previous Notice is being modified to reflect a change in the NAICS Code to 541330.\nSTATEMENT OF WORK\nThe Architect/Engineer (A/E) firm shall provide professional services for 100% design to replace all existing security cameras and add additional cameras throughout the VA Northern Indiana Health Care System, Marion Campus, located at 1700 E. 38th Street, Marion, IN 46953. The design will include Schematic Design, Design Development, Construction/Bid Documents in accordance with the A/E Design Submission Instructions Document, Construction Administration Services, Technical Specifications, and Cost Estimates. The replacement of all security cameras shall be designed to accommodate the following functions based on the guides, manuals, and planning criteria:\n\nReplace Cameras\nCompatible with the current Electronic Security System:\nIP Addressable:\nAC Powered:\nWithstanding extreme temperatures:\n\nNew Cameras\nCompatible with the current Electronic Security System:\nIP Addressable:\nAC Powered:\nWithstanding extreme temperatures:\n\nSpecial items to consider for this project:\nLocations of IT closets and electrical closets should be identified for access to the security network. \nMeans of getting access to the camera locations.\nA/E firm will provide details of each camera location.\n\nThe Schematic Design shall include a comprehensive study, inspection, and report of the existing project area conditions, which shall include HVAC, electrical, architectural components, plumbing, site locations, etc. \n\nA/E shall develop a design and plan to replace the existing cameras and make all necessary upgrades for power and network connections. \n\nA/E shall develop a plan and design to add additional cameras per security requirements.\n\nA/E shall provide a preliminary construction duration time for planning purposes. This information shall be communicated to all bidders for their review and inclusion within their bids. It shall be communicated within the bid documents that the contractor will be required to review and provide any concerns regarding the projected construction duration.\n\nA/E shall develop and provide a schedule of equipment necessary to activate and operate the systems located in the project area. \n\nA/E will be responsible for the complete functional design and providing biddable documents that meet all the requirements. The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management. It is the master repository for all VA Numbered Standards for Construction, including design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, physical security and resiliency, and design guides. The documents of the TIL shall serve as the minimum design criteria for all VA projects, including the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. \n\nVA additionally, through the documents on the TIL, has adopted the latest edition of the following codes and standards (but not limited to): \n\nOccupational, Safety and Health Administration (OSHA) Standards\nInternational Building Code (IBC)\nNational Electrical Code (NEC)\nNFPA 101 Life Safety Code\nNational Fire Protection Association (NFPA) Codes, except for NFPA 5000 and NFPA 900\nNational Standard Plumbing Code (NSPC)\nSafety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1\nASME Boiler and Pressure Vessel Code\nASME Code for Pressure Piping\nInternational Plumbing Code (IPC)\nArchitectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities\nBuilding Code Requirements for Reinforced Concrete, American Concrete Institute (ACI 318 2) and Commentary (ACI 318 R2)\nManual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)\nEnergy Policy Act of 2005 (EPAct)Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1\nDOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial, and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434, and 435\nFederal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)\nExecutive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management\nThe Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification\nVentilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1\nSafety Standard for Refrigeration Systems ASHRAE Standard 15\nU.S. National CAD Standard\n\nWhere conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department-wide.\n\nDesigns for construction must produce a complete and usable facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. Additionally, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately, unless directed otherwise by the VA. Equipment that can be part of the design includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.\n\nThe A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence.\n\nThe project is to provide all necessary modifications and additions to the VA NIHCS existing building structure, mechanical, electrical, and plumbing work. \n\nA/E shall be responsible for reviewing existing conditions at locations planned for development. Existing drawings of Buildings are on file at the VA NIHCS for review by the A/E. Access to files shall be coordinated with the COR. \n\nThe AE will employ a commissioning agent to certify that the design and construction meet Federal Mandates. The commissioning authority will verify the performance of the components and systems and, to ensure design requirements are met, develop a commissioning plan, including commissioning or requirements in construction documents, verification of installation and performance of commissioned systems (testing and system monitoring), operation/maintenance manuals and training, and a commissioning report. The A/E team shall work with the commissioning agent throughout the design and construction process to ensure all sustainable objectives are met. \n\nThe AE will employ a third-party construction cost estimator. The cost estimator is to be a separate, independent, unbiased, and non-affiliated entity subcontracted by the A/E. The A/E may not use their own personnel to complete any requirements stated within the Cost Manual. \n\nAll drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD), which are available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2020 or the latest version available to VA NIHCS, Marion Campus.\n\nThe project BIM model minimum requirements shall be developed to include the systems described below, as they would be built, the processes of installing them, and to reflect record drawing conditions (possibly incorporating into the Marion VAMC Master Record Drawing pending facility expertise). The deliverable model at the DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.\n\nArchitectural/Interior Design\nSquare Footage/Volume including Room Names and Numbers\nDepartmental Ownership\n(By Common Name, Capital Asset Inventory Department Definition, and Strategic Capital Investment Program Department Definition)\nArchitectural Schedules\nWalls and Curtain Wall Sizes, Shapes, and Material Data\nDoors\nWindows\nLouvers\nRoof\nFloors\nCeilings\nVertical Circulation\nArchitectural Specialties and Woodwork\nLife Safety Information\n(Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)\nGeneral Signage\nSchedules\nFurniture\nEquipment\nStructural\nFoundations\nShafts and Pits\nMechanical\nHVAC\nPlumbing\nElectrical/Telecommunications\nPower and Lighting\nSteam Distribution\nNurse Call System\nAsbestos/ Hazard Material Info\nSecurity System Information\n(Access Controls, Security Cameras, Panic Alarms, Overhead Paging)\nExterior Building Information\n3D Model Renderings\nOther Engineering Data as Required\n\nA/E shall develop a phasing plan and develop a deduct bid alternate for the project award, which will be based on available funding for the construction of $812,000.\n\nGENERAL\n\nThe VA NIHCS offices of Engineering Service and VISN Contracting will give the A/E the appropriate orientation. The A/E shall prepare all necessary drawings. The degree of completion and the stages of submission are specified as follows. The VA NIHCS will provide all standard details, master specifications, design criteria, etc. \n\nA/E discussion with the VA NIHCS personnel concerning requirements will be arranged by and participated in by appropriate Engineering Service personnel. The A/E shall participate with the Project Engineering and other Services in the review of project scope, design review comments, etc.\n\nThere will be (1) submissions for schematic design drawings, and one (1) submission for design development drawings, (3) three submissions for construction documents (95% and 100% complete) plus a final submission which constitutes a complete bid package consisting of drawings, specifications, detailed final cost estimates, phasing and sequence drawings within each phase, and project bid alternates.\n\nDrawings showing architectural and other features of the affected system/building are available in files of the Engineering Service, VA NIHCS. The drawings are not to be expected to be accurate in all respects, and the Architect-Engineer is to verify all features affecting the project by field investigation.\n\nThe A/E shall develop the project utilizing Revit 2020 and Building Information Modeling (BIM) to develop architectural design drawings, renderings, construction documents, and record drawings at completion of construction as per the VA BIM guide located on the VA Technical Information Library (TIL). At each scheduled submittal date, the A/E shall submit to the VA a list of the submitted files that shall include 3D Views, Facility Data, and Revit Data Files. Submittal drawings shall be full-size plots suitable for half-size reproduction.\n\nThe VA has ownership of the rights at the date of Closeout Submittal to all CAD files, Revit 2020 BIM Model, and Facility Data developed for the Project. The VA may make use of this data following any deliverables.\n\nFor preparation of construction specifications, the A/E will provide specifications in \"Word\" format and PDF format. The A/E shall supply copies of the specification files, combined into a single document, to be electronically transported to the CO for incorporation into the VA specification booklet.\n\nSchedule & Submission Requirements \nTimes listed herein are approximate and subject to negotiation. Each milestone in the timeline is subject to completion of the predecessor task and project requirements external to the AE scope; as such, calendar days for task completion shall be negotiated instead of actual dates. \n\nThe following is an estimated milestone schedule in terms of business days. Federal holidays do not count as business days.\nActivity\nLevel of Completion\nCalendar Days\n\nSchematic Submission (SC)\n35%\n30\nAfter Notice to Proceed\nVA Review of 35% (SC)\n\n14\nAfter Receipt of 35% Submission\nDesign Development Submission (DD)\n65%\n33\nAfter VA Approval of 35% SC Submission\nVA Review of 65% (DD)\n\n14\nAfter Receipt of 65% Submission\nConstruction Document Submission (CD)\n95%\n30\nAfter VA Approval of 65% DD Submission\nVA Review of 95% (CD)\n\n14\nAfter Receipt of 95% Submission\nConstruction Document Bid Set Submission (CDBS)\n100%\n24\nAfter VA Approval of 95% CD Submission\nVA Review of 100% CDBS\n\n14\nAfter Receipt of 100% CDBS Submission \nDeliver Final Construction Document Bid Set\n\n7\nAfter VA Approval of 100% CDBS Submission\n\n\n\n\n\n\n124\nA/E Design\n\n\n56\nVA Review\n\n\n180\nTotal Design Timeframe\n\nThe design schedule is 180 days to complete Schematic Design, Design Development, Construction Documents, Technical Specifications, and Cost Estimates for Construction. Completion of Construction Administration Services will not be dependent upon the award of the Construction Contract.\nConstruction Period Services\nContract Procurement\nAttend the contractor s Pre-Bid site visit and respond with recommendations to any questionable items. If necessary, develop amendments or assist with project procurement. A written response is required. \nSubmittal Review\nThe A/E firm shall review all construction materials, equipment, and change orders proposed by the contractor for use in the construction of this project. All submittals and change order proposals will be reviewed for compliance with the specifications and reasonable costs and returned to Engineering Service within five (5) calendar days after receipt. \n\nSite Visits\nThe A/E shall provide site visits as requested by the COR as noted below:\nOne (1) visit for the pre-bid conference. \nZero (0) visit for the pre-construction conference. \nEight (4) visits for general construction inspection/progress. \nTwo (2) visits for final inspections.\nA/E to provide other construction phase services as defined in the signed contract. \nMisc. \nThe A/E shall review and answer all RFI s submitted by the contractor and returned to Engineering Service within five (5) calendar days after receipt. \nA/E to participate in weekly telephonic project meetings with the VA and contractor. \nAs-Built Drawings\nThe A/E shall modify design drawings and models based on marked drawings supplied by the contractor, and these modifications are to be verified by the A/E in the field. As-Builts are to include all addenda and bulletins issued by the VA/AE during construction. These changes shall be bubbled and dated. An electronic Revit BIM 2020 and AutoCAD 2020 model of the As-Builts is to be submitted to the COR on CD-ROM. Any approved shop drawings with major differences from contract drawings, supplemental agreements, processed change orders, etc., shall be incorporated. The A/E shall deliver updated record drawings (4 sets): (2) ½ size sets, (2) full-size sets.\nSELECTION CRITERIA:\n\nProfessional qualifications necessary for satisfactory performance of required services.\nSpecialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.\nCapacity to accomplish the work in the required time.\nPast performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.\nLocation in the general geographical area of the project and knowledge of the locality of the project; provided that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project.\n\nExperience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.\nThe extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors.\nSUBMITTAL INSTRUCTIONS:\nAll interested and capable firms are to submit an electronic SF330 package for review. Physical copies will not be accepted. SF330s can be submitted to the following email address:\nElizabeth.Finley1@va.gov\nThe package must be received and under government control NLT 11/12/2025 at 10:00 A.M. EST.\n\n***END OF ANNOUNCEMENT***\n\n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
C1DA--AE Replace Security Cameras 610-25-213 tender | Tenqual