Back to search
SAM.govNotice b492eecf0d9642978d875fb3b5cf852f

Y1DA--NRM-CONST- 561A4-26-501 Replace Roof Building 143 - Design-Build

Country
United States
Published
February 2, 2026
Deadline
February 17, 2026

Description

{"description":"This Pre-solicitation notice is for the procurement of design-build services under Solicitation No. 36C24226R0071 and Project Number Project No. 561A4-26-501 Replace Roof Building 143 at the VA New Jersey Healthcare Systems, 151 Knollcroft Rd., Lyons, NJ 07939.\n\nThis procurement is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. As a result, eligible SDVOSB's may submit a proposal in response to the anticipated Request for Proposal (RFP), which will be considered by the agency. This project is classified under NAICS Code 541330 and has a size standard of $47 Million. The cost estimate range for this project is $10,000,000 and $20,000,000.\n\nStatement of Work:\n\nThe contractor shall satisfactorily provide Design Build services inclusive of all labor, materials, equipment, and supervision necessary to design and construct and replace the roofing system of building 143. site preparation needed to install Design Build team shall furnish professional and install all labor and material necessary to construct the items required in the specifications and drawings identified within Project 561A4-26-501 Replace Roof Building 143 at the VA NJ Health Care System, Lyons, NJ, 07939.\n\n4. Specific Tasks. \n\nThe work calls for a complete design and construction of the removal and replacement of all roofing material that is determined to be necessary for replacement within building 143. This includes but not limited to:\nThe gutters are to be replaced, they shall be all copper with soldered connections\nThe leaders are to be replaced as needed\nLighting protection\nSnow guards as necessary\nDecking allowance as necessary up to of 100% to be included\n\nDemolition includes but not limited to the removal of existing roofing, the removal of damaged or deteriorated decking, removal of exiting lightning protection and the removal of existing gutters and downspouts.\n\nProvide a PIH/CIH consultant for review of the VA Medical Center asbestos inspection report. The PIH/CIH consultant shall coordinate with A/E to ensure that fully coordinated drawings are provided for all asbestos abatement and related restoration work id necessary.\nCoordinate with the State of New Jersey to address all items in relation to Historic Building Preservation. Note that VANJHCS Lyons Campus is on the National Register of Historic Places.\nPrepare a review package to be presented to the New Jersey and VA Historical oversite authorities.\n\nCodes and Standards including but not limited to:\nInternational Existing Building Code 2021\nUniform Accessibility Standards and ADA standards for accessible design\nInternational Fire Code 2021\nVA Seismic Requirements H-18-8, 2023 Edition\nResource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et\nseq.)\nThe National Energy Conservation Policy Act (42 U.S.C. 8262g)\nThe Pollution Prevention Act of 1990 (42 U.S.C. 13101, et seq.)\nExecutive Order 13148 of April 21, 2000, Greening the Government through Leadership in Environmental Management\nExecutive Order 13101 of September 14, 1998, Greening the Government\nthrough Waste Prevention, Recycling, and Federal Acquisition; and\nExecutive Order 13123 of June 3, 1999, Greening the Government\nthrough Efficient Energy Management\n\n5. Work-Related Services\n\nRetain a set of drawings at the Site, and redline those drawings to indicate any deviations made from the requirements indicated in those drawings during the production of the Work.\nFurnish miscellaneous shop drawings if and to the extent necessary for production of the Work.\nFurnish an electronic copy of the record drawings showing material changes in the Work made during construction based on markup drawings and other Work changes made by the Work Design Build teams during their performance of the Work.\nThe design for the Work will incorporate applicable building codes, rules, and regulations enacted by the state where the Site is located.\nThe work includes but not limited to the following divisions:\n\nDivision 0 Special Sections \nArchitectural and Engineering Design\nArchitectural, structural, M.E.P. engineering fees are included in this equipment for both phases. \nPermit fees are included. \nProvide up to three (3) design modifications to meet customer approval. \nProvide and maintain as-built field drawings depicting red lined field changes. \nProvide three (3) sets of final extended installation (non-bid) documents. \n\nDivision 01 General Requirements\nAttend a kickoff meeting at the Site to review the Work content, design for the Work, drawing approval process, if any, and finalize the schedule for the design and production of the Work.\nAttend a pre-construction meeting and periodic progress meetings. Compile and distribute the minutes of those meetings and an updated construction schedule following each of those meetings.\nMaintain project management and full-time construction supervision services at the Site during production of the Work.\nAssist in preparation of Infection Control Risk Assessment/Construction Impact Assessment Review (ICRA) document and comply with this document. The following shall be provided:\nSeal off applicable Site supply and return diffusers and grilles to minimize dust contamination of ductwork and the surrounding areas.\nFurnish and install (i) temporary dust barriers (zipped poly barrier attached to the door frame(s)) between the Site and the adjoining areas, and (ii) temporary walk-off mats at the entrance(s) to the Site, and (iii) a temporary negative air unit for the Site with HEPA filtration for general dust control.\n Maintain the Site in a reasonably clean and safe condition in compliance with applicable OSHA regulations.\nComply with the reasonable written fire prevention measures and other written general construction- related rules furnished by Customer and that are in effect at the Site. Assist in preparation of the Interim Life Safety Measures (ILSM) document and comply with this document.\nThe Work will be produced during Standard Work Hours, except as otherwise required by the owner to maintain uninterrupted services to the facility.\nClean the Site (broom clean) daily. At the completion of the Work, remove all tools, equipment, surplus material, and temporary structures, and clean the Site (broom clean).\nFurnish a dumpster for Work rubbish and debris near the Site in an area designated by Customer.\nIf areas adjoining the Site are occupied during the production of the Work, coordinate the Work so that the use and occupancy of those areas will not be unreasonably impaired for extended periods of time.\nCoordinate the delivery and storage of the Work materials with Customer.\nThe Work shall comply with VA requirements, and applicable building codes, rules, and regulations enacted by the state where the Site is located, or as otherwise directed by the VA.\nIf finishes (e.g., plastic laminate, floor or ceiling tile, carpet, ceramic tile, paint, stain, etc.) are included in the Work, samples of those finish materials will be furnished to Customer for its selection of the color/pattern of those finishes.\nPrepare and maintain a construction schedule for the work.\nProvide general liability insurance.\nProvide transportation, handling, storage and protection for all contractor provided materials and equipment. \nOff hours work is included for noise abatement and utility shutdowns only. Weekend work or overtime as required. \nAny item(s) to be salvaged by the owner are to be removed by the contractor from the site before work begins. \nContractor shall coordinate with facilities for availability from access to the loading dock to the work site for contractor material deliveries. \nParking spaces not available. Coordinate with facilities for availability, if extended installation workers required. \nThe use of owner s facilities and utilities shall be permitted during work. \nProvide required temporary facilities, including but not limited to:\nTemporary barriers / structures to secure work areas for safety purposes, noise reduction and dust containment.\nTemporary seal supply and return air diffusers to minimize contamination of ductwork and surrounding areas.\nProvide foot mats at work area entrances and exits.\nProvide Infection Disease Control (ICRA). \nProvide Interim Life Safety Measures (ILSM). \nProvide Water Infection Control Risk Assessment (WICRA).\nProvide dumpsters for disposal of work site debris and materials. \nInfectious control standards shall comply with owner s standards. \nComply with utility interruption policies. \nMaintain an up to date copy of construction documents with redlined as built conditions. \nClose out documents will be presented at project completion upon receipt of owner signed substantial completion form. \n\nDivision 02 Existing Conditions\nThe site work/selective demolition work includes the following services and Work elements. The removed items include the disposal of those items, unless otherwise specified. These site work/selective demolition Work elements will be performed only to the extent necessary for the production of the Work.\nAsbestos:\nPre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, worksite preparations, emergency procedures arrangements, and standard operating procedures for OSHA Class II and EPA Category I asbestos abatement work.\nAbatement activities including removal, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.\nCleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.\n\nDivision 06 Wood, Plastics, and Composites\nProvide millwork as specified within the specifications and drawings. \nComplete roof removal for new roof system installation.\nRoofing membrane and selective roofing system component removal for new roof membrane installation\nExisting Roofing System: EPDM, Asphalt Shingles. System components include: Roof insulation, roofing membrane, cover board, substrate board.\n\nDivision 07 Thermal and Moisture Protection\nThermal insulation:\nBatt insulation with radiant barrier in-between members of existing roof structure.\nAttic rafter vents.\nRoof and deck insulation:\nSubstrate board, vapor retarder, and cover board on existing concrete or metal deck substrates ready to receive roofing or waterproofing membrane.\nRepairs and alteration work to existing roof insulation.\nAsphalt Shingles:\nFiberglass asphalt shingles over underlayment nailed to roof sheathing.\nThermoplastic Polyolefin (TPO) roofing:\nTPO sheet roofing adhered to roof deck.\nFlashing and sheed metal:\nFormed sheet metal work for wall and roof flashing, copings, roof edge metal, fasciae, drainage specialties, and formed expansion joint covers.\nJoint Sealant:\nInterior and exterior sealant and their application, wherever required for complete installation of building materials or systems.\nFurnish and install caulking and, where applicable, fire rated sealant compounds at the Work penetrations. The fire rated materials will be consistent with the fire rating of the penetrated building component.\n\nDivision 22 Plumbing\nFacility Storm Drainage: \nIncluding piping and all necessary accessories as designated \n\nDivision 26 Electrical\nFurnish and install electrical systems, materials, equipment, and accessories in accordance with the specifications and drawings. Capacities and ratings of motors, transformers, conductors and cable, switchboards, switchgear, panelboards, motor control centers, generators, automatic transfer switches, and other items and arrangements for the specified items are shown on the drawings.\nElectrical service entrance equipment and arrangements for temporary and permanent connections to the electric utility company s system shall conform to the electric utility company's requirements. Coordinate fuses, circuit breakers and relays with the electric utility company s system, and obtain electric utility company approval for sizes and settings of these devices.\nConductor ampacities specified or shown on the drawings are based on copper conductors, with the conduit and raceways sized per NEC. Aluminum conductors are prohibited.\n\nBased on Design drawings, the following items are specifically as required from Proposal. Contractor shall include. Conduct site evaluation as needed. \nWork in an environment where there is possible contamination by the presence, removal, or encapsulation of hazardous material(s) as required. \nMold, asbestos or hazardous material survey(s), removal or abatement of any kind as required. \nUpgrades associated with ADA or code requirements (if any) outside this work area as required. \nAny other item(s) not specifically mentioned or otherwise included in this Proposal\n\n6. General Requirements of Construction:\nProvide professional full time on-site supervision of the work. \nHold bi-weekly construction meetings and prepare meeting minutes. \nPrepare and maintain a construction schedule for the work. \nCoordinate power and other utility shutdowns with facility representative. \nCoordinate materials delivery and storage with facility representative. \nRemove rubbish and debris as it accumulates.\nAll debris/trash must be removed from the construction site daily.\nProvide required temporary facilities, including but not limited to: \nTemporary barriers/structures to secure work areas for safety purposes noise reduction and dust containment. \nTemporarily seal supply/return air diffusers to minimize contamination of ductwork and surrounding areas. \nTemporary lighting above ceiling during construction.\nFoot mats at work area entrances and exits.\nInfection Disease Control. \nAbide by facility rules and regulations in effect at the site\nProvide current insurance certificates\nRemove and legally dispose of debris. \n\nDesign Build team shall be required to provide the following documentation for all of his/her personnel working on VA property:\nBackground investigation Worksheet (Attachment No. 2 under SOP Acquisition)\nVA Form 0711\nSecurity and Privacy Training certification\nOHSA certification\nTB tuberculin test certification\n\nDesign Build team is to start within 10 days of receiving the Notice to Proceed. Period of Performance is 90 days (for design) and 60 days (for construction) from the official Notice to Proceed.\n\nAll other details and information shall be contained in the publication of the official solicitation under this number which shall be posted on https://beta.sam.gov/. The solicitation will be released on or about February 17, 2026. The response submittal instructions, date, and time will be included in the solicitation. This project requires bonding and all responses/submissions shall be electronic; hardcopy and faxed proposal will not be accepted. It is the responsibility of the prospective contractor to ensure the timely delivery of their proposal package. \n\nAll prospective contractors must be currently registered in www.sam.gov and be registered and verified as a SDVOSB in www.vip.vetbiz.gov at the time of offer submission and before award of this procurement.\n\nEnd of Description\n\n"} Solicitation Number: 36C24226R0071 Type: Presolicitation Base Type: Presolicitation NAICS: 238160 Classification Code: Y1DA Response Deadline: 2026-02-17T15:00:00-05:00 Office Address: ALBANY, NY POC: Mitchelle R Labady, mitchelle.labady@va.gov, 718-584-9000 x4329 {"description":"This Pre-solicitation notice is for the procurement of design-build services under Solicitation No. 36C24226R0071 and Project Number Project No. 561A4-26-501 Replace Roof Building 143 at the VA New Jersey Healthcare Systems, 151 Knollcroft Rd., Lyons, NJ 07939.\n\nThis procurement is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. As a result, eligible SDVOSB's may submit a proposal in response to the anticipated Request for Proposal (RFP), which will be considered by the agency. This project is classified under NAICS Code 541330 and has a size standard of $47 Million. The cost estimate range for this project is $10,000,000 and $20,000,000.\n\nStatement of Work:\n\nThe contractor shall satisfactorily provide Design Build services inclusive of all labor, materials, equipment, and supervision necessary to design and construct and replace the roofing system of building 143. site preparation needed to install Design Build team shall furnish professional and install all labor and material necessary to construct the items required in the specifications and drawings identified within Project 561A4-26-501 Replace Roof Building 143 at the VA NJ Health Care System, Lyons, NJ, 07939.\n\n4. Specific Tasks. \n\nThe work calls for a complete design and construction of the removal and replacement of all roofing material that is determined to be necessary for replacement within building 143. This includes but not limited to:\nThe gutters are to be replaced, they shall be all copper with soldered connections\nThe leaders are to be replaced as needed\nLighting protection\nSnow guards as necessary\nDecking allowance as necessary up to of 100% to be included\n\nDemolition includes but not limited to the removal of existing roofing, the removal of damaged or deteriorated decking, removal of exiting lightning protection and the removal of existing gutters and downspouts.\n\nProvide a PIH/CIH consultant for review of the VA Medical Center asbestos inspection report. The PIH/CIH consultant shall coordinate with A/E to ensure that fully coordinated drawings are provided for all asbestos abatement and related restoration work id necessary.\nCoordinate with the State of New Jersey to address all items in relation to Historic Building Preservation. Note that VANJHCS Lyons Campus is on the National Register of Historic Places.\nPrepare a review package to be presented to the New Jersey and VA Historical oversite authorities.\n\nCodes and Standards including but not limited to:\nInternational Existing Building Code 2021\nUniform Accessibility Standards and ADA standards for accessible design\nInternational Fire Code 2021\nVA Seismic Requirements H-18-8, 2023 Edition\nResource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et\nseq.)\nThe National Energy Conservation Policy Act (42 U.S.C. 8262g)\nThe Pollution Prevention Act of 1990 (42 U.S.C. 13101, et seq.)\nExecutive Order 13148 of April 21, 2000, Greening the Government through Leadership in Environmental Management\nExecutive Order 13101 of September 14, 1998, Greening the Government\nthrough Waste Prevention, Recycling, and Federal Acquisition; and\nExecutive Order 13123 of June 3, 1999, Greening the Government\nthrough Efficient Energy Management\n\n5. Work-Related Services\n\nRetain a set of drawings at the Site, and redline those drawings to indicate any deviations made from the requirements indicated in those drawings during the production of the Work.\nFurnish miscellaneous shop drawings if and to the extent necessary for production of the Work.\nFurnish an electronic copy of the record drawings showing material changes in the Work made during construction based on markup drawings and other Work changes made by the Work Design Build teams during their performance of the Work.\nThe design for the Work will incorporate applicable building codes, rules, and regulations enacted by the state where the Site is located.\nThe work includes but not limited to the following divisions:\n\nDivision 0 Special Sections \nArchitectural and Engineering Design\nArchitectural, structural, M.E.P. engineering fees are included in this equipment for both phases. \nPermit fees are included. \nProvide up to three (3) design modifications to meet customer approval. \nProvide and maintain as-built field drawings depicting red lined field changes. \nProvide three (3) sets of final extended installation (non-bid) documents. \n\nDivision 01 General Requirements\nAttend a kickoff meeting at the Site to review the Work content, design for the Work, drawing approval process, if any, and finalize the schedule for the design and production of the Work.\nAttend a pre-construction meeting and periodic progress meetings. Compile and distribute the minutes of those meetings and an updated construction schedule following each of those meetings.\nMaintain project management and full-time construction supervision services at the Site during production of the Work.\nAssist in preparation of Infection Control Risk Assessment/Construction Impact Assessment Review (ICRA) document and comply with this document. The following shall be provided:\nSeal off applicable Site supply and return diffusers and grilles to minimize dust contamination of ductwork and the surrounding areas.\nFurnish and install (i) temporary dust barriers (zipped poly barrier attached to the door frame(s)) between the Site and the adjoining areas, and (ii) temporary walk-off mats at the entrance(s) to the Site, and (iii) a temporary negative air unit for the Site with HEPA filtration for general dust control.\n Maintain the Site in a reasonably clean and safe condition in compliance with applicable OSHA regulations.\nComply with the reasonable written fire prevention measures and other written general construction- related rules furnished by Customer and that are in effect at the Site. Assist in preparation of the Interim Life Safety Measures (ILSM) document and comply with this document.\nThe Work will be produced during Standard Work Hours, except as otherwise required by the owner to maintain uninterrupted services to the facility.\nClean the Site (broom clean) daily. At the completion of the Work, remove all tools, equipment, surplus material, and temporary structures, and clean the Site (broom clean).\nFurnish a dumpster for Work rubbish and debris near the Site in an area designated by Customer.\nIf areas adjoining the Site are occupied during the production of the Work, coordinate the Work so that the use and occupancy of those areas will not be unreasonably impaired for extended periods of time.\nCoordinate the delivery and storage of the Work materials with Customer.\nThe Work shall comply with VA requirements, and applicable building codes, rules, and regulations enacted by the state where the Site is located, or as otherwise directed by the VA.\nIf finishes (e.g., plastic laminate, floor or ceiling tile, carpet, ceramic tile, paint, stain, etc.) are included in the Work, samples of those finish materials will be furnished to Customer for its selection of the color/pattern of those finishes.\nPrepare and maintain a construction schedule for the work.\nProvide general liability insurance.\nProvide transportation, handling, storage and protection for all contractor provided materials and equipment. \nOff hours work is included for noise abatement and utility shutdowns only. Weekend work or overtime as required. \nAny item(s) to be salvaged by the owner are to be removed by the contractor from the site before work begins. \nContractor shall coordinate with facilities for availability from access to the loading dock to the work site for contractor material deliveries. \nParking spaces not available. Coordinate with facilities for availability, if extended installation workers required. \nThe use of owner s facilities and utilities shall be permitted during work. \nProvide required temporary facilities, including but not limited to:\nTemporary barriers / structures to secure work areas for safety purposes, noise reduction and dust containment.\nTemporary seal supply and return air diffusers to minimize contamination of ductwork and surrounding areas.\nProvide foot mats at work area entrances and exits.\nProvide Infection Disease Control (ICRA). \nProvide Interim Life Safety Measures (ILSM). \nProvide Water Infection Control Risk Assessment (WICRA).\nProvide dumpsters for disposal of work site debris and materials. \nInfectious control standards shall comply with owner s standards. \nComply with utility interruption policies. \nMaintain an up to date copy of construction documents with redlined as built conditions. \nClose out documents will be presented at project completion upon receipt of owner signed substantial completion form. \n\nDivision 02 Existing Conditions\nThe site work/selective demolition work includes the following services and Work elements. The removed items include the disposal of those items, unless otherwise specified. These site work/selective demolition Work elements will be performed only to the extent necessary for the production of the Work.\nAsbestos:\nPre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, worksite preparations, emergency procedures arrangements, and standard operating procedures for OSHA Class II and EPA Category I asbestos abatement work.\nAbatement activities including removal, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.\nCleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.\n\nDivision 06 Wood, Plastics, and Composites\nProvide millwork as specified within the specifications and drawings. \nComplete roof removal for new roof system installation.\nRoofing membrane and selective roofing system component removal for new roof membrane installation\nExisting Roofing System: EPDM, Asphalt Shingles. System components include: Roof insulation, roofing membrane, cover board, substrate board.\n\nDivision 07 Thermal and Moisture Protection\nThermal insulation:\nBatt insulation with radiant barrier in-between members of existing roof structure.\nAttic rafter vents.\nRoof and deck insulation:\nSubstrate board, vapor retarder, and cover board on existing concrete or metal deck substrates ready to receive roofing or waterproofing membrane.\nRepairs and alteration work to existing roof insulation.\nAsphalt Shingles:\nFiberglass asphalt shingles over underlayment nailed to roof sheathing.\nThermoplastic Polyolefin (TPO) roofing:\nTPO sheet roofing adhered to roof deck.\nFlashing and sheed metal:\nFormed sheet metal work for wall and roof flashing, copings, roof edge metal, fasciae, drainage specialties, and formed expansion joint covers.\nJoint Sealant:\nInterior and exterior sealant and their application, wherever required for complete installation of building materials or systems.\nFurnish and install caulking and, where applicable, fire rated sealant compounds at the Work penetrations. The fire rated materials will be consistent with the fire rating of the penetrated building component.\n\nDivision 22 Plumbing\nFacility Storm Drainage: \nIncluding piping and all necessary accessories as designated \n\nDivision 26 Electrical\nFurnish and install electrical systems, materials, equipment, and accessories in accordance with the specifications and drawings. Capacities and ratings of motors, transformers, conductors and cable, switchboards, switchgear, panelboards, motor control centers, generators, automatic transfer switches, and other items and arrangements for the specified items are shown on the drawings.\nElectrical service entrance equipment and arrangements for temporary and permanent connections to the electric utility company s system shall conform to the electric utility company's requirements. Coordinate fuses, circuit breakers and relays with the electric utility company s system, and obtain electric utility company approval for sizes and settings of these devices.\nConductor ampacities specified or shown on the drawings are based on copper conductors, with the conduit and raceways sized per NEC. Aluminum conductors are prohibited.\n\nBased on Design drawings, the following items are specifically as required from Proposal. Contractor shall include. Conduct site evaluation as needed. \nWork in an environment where there is possible contamination by the presence, removal, or encapsulation of hazardous material(s) as required. \nMold, asbestos or hazardous material survey(s), removal or abatement of any kind as required. \nUpgrades associated with ADA or code requirements (if any) outside this work area as required. \nAny other item(s) not specifically mentioned or otherwise included in this Proposal\n\n6. General Requirements of Construction:\nProvide professional full time on-site supervision of the work. \nHold bi-weekly construction meetings and prepare meeting minutes. \nPrepare and maintain a construction schedule for the work. \nCoordinate power and other utility shutdowns with facility representative. \nCoordinate materials delivery and storage with facility representative. \nRemove rubbish and debris as it accumulates.\nAll debris/trash must be removed from the construction site daily.\nProvide required temporary facilities, including but not limited to: \nTemporary barriers/structures to secure work areas for safety purposes noise reduction and dust containment. \nTemporarily seal supply/return air diffusers to minimize contamination of ductwork and surrounding areas. \nTemporary lighting above ceiling during construction.\nFoot mats at work area entrances and exits.\nInfection Disease Control. \nAbide by facility rules and regulations in effect at the site\nProvide current insurance certificates\nRemove and legally dispose of debris. \n\nDesign Build team shall be required to provide the following documentation for all of his/her personnel working on VA property:\nBackground investigation Worksheet (Attachment No. 2 under SOP Acquisition)\nVA Form 0711\nSecurity and Privacy Training certification\nOHSA certification\nTB tuberculin test certification\n\nDesign Build team is to start within 10 days of receiving the Notice to Proceed. Period of Performance is 90 days (for design) and 60 days (for construction) from the official Notice to Proceed.\n\nAll other details and information shall be contained in the publication of the official solicitation under this number which shall be posted on https://beta.sam.gov/. The solicitation will be released on or about February 17, 2026. The response submittal instructions, date, and time will be included in the solicitation. This project requires bonding and all responses/submissions shall be electronic; hardcopy and faxed proposal will not be accepted. It is the responsibility of the prospective contractor to ensure the timely delivery of their proposal package. \n\nAll prospective contractors must be currently registered in www.sam.gov and be registered and verified as a SDVOSB in www.vip.vetbiz.gov at the time of offer submission and before award of this procurement.\n\nEnd of Description\n\n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Y1DA--NRM-CONST- 561A4-26-501 Replace Roof Building 143 - Design-Build tender | Tenqual