W099--Office Containers- Additional Office Space (FY26)
- Country
- United States
- Published
- December 8, 2025
- Deadline
- December 15, 2025
Description
{"description":"36C24126Q0036 - Office Containers Q&A\n\nIn regards to subject solicitation, would it be possible to provide pictures of the locations identified in the solicitation, paragraph 7: Pictures will be provided of the current setup.\nA-Building 5 alley in the Northeast corner of Parking Lot W5\nB-Building 5 alley in the Northeast corner of Parking Lot W5, against the granite sidewalk curbing\nC-Building 4 alley in the Northeast corner of Parking Lot W5\nPictures will help determine whether certain type of work will be necessary or not.\n\nOffice Type is a metal container office within scope or is some other TEMP office construction such as typical mobile trailer preferred? Yes. The office containers are within spec for the scope of work.\n\n\n# Units the solicitation indicates (2) 20 -0 units and (1) 40 -0 unit. Is width the standard 8 -0 and height 8 -6 or are other DIMS preferred? Standard height/width is acceptable. \n\n\nINT Build-Out \nWalls / Ceilings are walls cladded in pre-fab metal or other material such as gypsum or wood paneling? PVC or plastic material walls and ceilings are sufficient. \nFlooring LVT or some other flooring specification? Vinyl Flooring is sufficient.\nLighting surface mount fluorescent or other? Please specify. Over ceiling lighting (LED)\nPower wall mount standard duplex 110V receptacles? How many? If other, please specify. What is amperage requirement for panel box? Power available. 110V and around 6 outlets\nHVAC one wall-mount mini-split? Any other HVAC specifications? HVAC provided. Heating and cooling. Outside attachment of HVAC system.\nPlumbing any plumbing, restroom required? No plumbing needed. \nADA Provision ramp access and 36 wide entry door only? Any other ADA provisions? No ADA provisions.\nDelivery Date what is intended date for VA personnel to occupy? 02/02/2026.\n\nThe pricing table shows 1 line item, with the description \"Office Containers\".\nWould you like the cost of all 3 containers in that 1 line item? Or should we have 3 line items (1 for each container)? All on one line item.\nCould you please clarify the required interior layout and configuration for each of the three office containers? Open for workspace office space. No dividers are needed. \n\nSpecifically, we would like to confirm whether VA Manchester has a preferred room partitioning, entry orientation, or workspace layout (e.g., open office, divided offices, or mixed use), or if the vendor may provide a standard commercial office configuration suitable for administrative occupancy\n\n\n"} Solicitation Number: 36C24126Q0036 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 532490 Classification Code: W099 Response Deadline: 2025-12-15T17:00:00-05:00 Office Address: TOGUS, ME Place of Performance: Manchester, NH, 03104 POC: Shawn Lawrence, Shawn.Lawrence@va.gov, 203-932-5711 {"description":"36C24126Q0036 - Office Containers Q&A\n\nIn regards to subject solicitation, would it be possible to provide pictures of the locations identified in the solicitation, paragraph 7: Pictures will be provided of the current setup.\nA-Building 5 alley in the Northeast corner of Parking Lot W5\nB-Building 5 alley in the Northeast corner of Parking Lot W5, against the granite sidewalk curbing\nC-Building 4 alley in the Northeast corner of Parking Lot W5\nPictures will help determine whether certain type of work will be necessary or not.\n\nOffice Type is a metal container office within scope or is some other TEMP office construction such as typical mobile trailer preferred? Yes. The office containers are within spec for the scope of work.\n\n\n# Units the solicitation indicates (2) 20 -0 units and (1) 40 -0 unit. Is width the standard 8 -0 and height 8 -6 or are other DIMS preferred? Standard height/width is acceptable. \n\n\nINT Build-Out \nWalls / Ceilings are walls cladded in pre-fab metal or other material such as gypsum or wood paneling? PVC or plastic material walls and ceilings are sufficient. \nFlooring LVT or some other flooring specification? Vinyl Flooring is sufficient.\nLighting surface mount fluorescent or other? Please specify. Over ceiling lighting (LED)\nPower wall mount standard duplex 110V receptacles? How many? If other, please specify. What is amperage requirement for panel box? Power available. 110V and around 6 outlets\nHVAC one wall-mount mini-split? Any other HVAC specifications? HVAC provided. Heating and cooling. Outside attachment of HVAC system.\nPlumbing any plumbing, restroom required? No plumbing needed. \nADA Provision ramp access and 36 wide entry door only? Any other ADA provisions? No ADA provisions.\nDelivery Date what is intended date for VA personnel to occupy? 02/02/2026.\n\nThe pricing table shows 1 line item, with the description \"Office Containers\".\nWould you like the cost of all 3 containers in that 1 line item? Or should we have 3 line items (1 for each container)? All on one line item.\nCould you please clarify the required interior layout and configuration for each of the three office containers? Open for workspace office space. No dividers are needed. \n\nSpecifically, we would like to confirm whether VA Manchester has a preferred room partitioning, entry orientation, or workspace layout (e.g., open office, divided offices, or mixed use), or if the vendor may provide a standard commercial office configuration suitable for administrative occupancy\n\n\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.