SDC25/26-3 - Desludging Victoria Road Wastewater Ponds - RFP
- Country
- New Zealand
- Published
- January 14, 2026
Description
RFx ID: 33171505 Organisation: Stratford District Council Open date: Monday, 8 December 2025 9:30 AM +13:00 Close date: Thursday, 15 January 2026 12:00 PM +13:00 Categories: 12141500 - Earth metals 12142100 - Industrial use gases 12350000 - Compounds and mixtures 72150000 - Specialized trade construction and maintenance services 77000000 - Environmental Services Region: Taranaki Overview: Stratford District Council operates a Wastewater Treatment Plant at 47 Victoria Road, Stratford to service the Stratford township. This s a crucial component of the town’s infrastructure, primarily servicing a residential population of approximately 6,500 people. The system also processes wastewater discharge from several local commercial and light industrial businesses and a dump station on Esk Road. The plant's overall function is to convert raw influent into treated effluent using a multi-stage pond system. The facility consists of one main wastewater stabilisation pond (Pond 1) and three smaller maturation ponds. Pond 1 is intended to operate at a depth of 3 to 4 metres when free of biosolids. Recent investigations have identified a significant build-up of biosolids that is affecting treatment performance. The four aerators within Pond 1 (two on each side) have contributed to uneven circulation, leading to biosolids accumulating around the pond edges and forming a central island. This has reduced the effective depth in parts of the pond to around 1 metre or less. Biosolids were last removed in 2004 by dredging and pumping into permeable geo-textile bags, which were then placed on an adjacent historic landfill site. After a drying period, the biosolids were spread over the landfill, capped, and returned to pasture. Although Stratford District Council has obtained resource consents from the Taranaki Regional Council to repeat the previously used desludging method, Council is open to alternative methods that will achieve the same outcomes. Accordingly, this Request for Proposal includes the following key components: 1. Preparatory the historic landfill site 2. Excavating biosolids from Pond 1 3. Dewatering the biosolids 4. Spreading the dewatered biosolids 5. Capping and reinstating the landfill site The Contractor is responsible for planning, executing, and monitoring all aspects of this project in strict accordance with the issued resource consents.
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.