Back to search
GETSNotice 32109674

C-25-152 Frankton Track Wastewater Construction

Country
New Zealand
Published
September 19, 2025

Description

RFx ID: 32109674 Organisation: Queenstown-Lakes District Council Open date: Friday, 1 August 2025 5:00 AM +12:00 Close date: Friday, 19 September 2025 4:00 PM +12:00 Categories: 72000000 - Building and Facility Construction and Maintenance Services 78102100 - Pipeline services 83101500 - Water and sewer utilities Region: Otago Overview: Queenstown Lakes District Council is seeking an experienced contractor to undertake upgrades of the Frankton Beach Pump Station, Rec Ground Pump Station and construct a new pressure main between Park Street and Frankton Beach Pump Station, including associated construction works. The existing gravity main along Frankton track is a high criticality asset. The sewer main is nearing capacity and carries a risk of untreated wastewater overflowing to the receiving natural environment (including Lake Whakatipu) in heavy rainfall events or natural disaster. Additional wastewater conveyance capacity between Queenstown CBD and Frankton Beach Pump Station is required to maintain levels of service and support projected demand growth in the area. A new pressure sewer main to run adjacent to the existing pipeline has been identified as the preferred solution. Improvements to the track will be made as part of the wastewater pipeline installation (e.g., strategic widening, stormwater management, pause-points etc.) The scope of work for the Frankton Track Wastewater Upgrade project includes: • Construction of a new pressure wastewater pipe from Cecil Road to Frankton Beach Pump Station (FBPS). Upgrade to the Recreation Ground Pump Station to convey wastewater through the new pressure main. • Construction of upgrades to the Frankton Beach Pump Station to receive the new pressure main. • Construction of upgraded stormwater systems to manage runoff from the track and catchments above. • Construct amendments to the existing track from Cecil Road through to the Frankton Beach Pump Station where they are required to facilitate the new pressure wastewater pipe and/or stormwater systems. • Construction of 6 pause points as outlined in the Urban and Landscape Design Framework (ULDF) dated 15 October 2021. Extra Attachments: Additional supporting documents are available as a OneDrive folder link "C-25-152 Support Info" - please request access from the Procurement Administrator at pmoprocurement@qldc.govt.nz.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
C-25-152 Frankton Track Wastewater Construction tender | Tenqual