Open & Inspect for SRC Remote Interface Controllers and Filter Alignment Test Fixture
- Country
- United States
- Published
- February 6, 2026
- Deadline
- February 12, 2026
Description
{"description":" Norfolk Naval Shipyard (NNSY) overhauls the F-1542 band pass filters for all surface craft communication systems. This overhaul involves alignment of frequencies which requires the use of filter alignment test fixture (P/N: 576056). The SRC remote interface controller is also used as a part of this process to allow for the coupler to test for remote control which is a requirement onboard the ships. NNSY owns two test fixtures, serial numbers 002 and 003, and two SRC Remote Interface Controllers serial number 0001, and 0002. NNSY requires an open and inspection because none of the units are in proper working order. When a filter is placed in the test bed and power is turned on, the gears start turning but then go beyond the limit switches which causes severe damage to the filter. The SRC is unresponsive and not communicating correctly with the filter. \n"} Solicitation Number: N4215826QB511 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 334220 Classification Code: J059 Response Deadline: 2026-02-12T10:00:00-05:00 Office Address: PORTSMOUTH, VA Place of Performance: Portsmouth, Virginia POC: Lillian Kwong, lillian.l.kwong.civ@us.navy.mil, 7577528162 {"description":" Norfolk Naval Shipyard (NNSY) overhauls the F-1542 band pass filters for all surface craft communication systems. This overhaul involves alignment of frequencies which requires the use of filter alignment test fixture (P/N: 576056). The SRC remote interface controller is also used as a part of this process to allow for the coupler to test for remote control which is a requirement onboard the ships. NNSY owns two test fixtures, serial numbers 002 and 003, and two SRC Remote Interface Controllers serial number 0001, and 0002. NNSY requires an open and inspection because none of the units are in proper working order. When a filter is placed in the test bed and power is turned on, the gears start turning but then go beyond the limit switches which causes severe damage to the filter. The SRC is unresponsive and not communicating correctly with the filter. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.