BKP 221.1 Timber-Aluminium Windows | Vertical Extension of the TBS5 Gymnasiums, Weinfelden
- Buyer
- Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
- Published
- June 16, 2026
- Deadline
- July 13, 2026
Description
Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.