H159--VANIHCS 3 Year Electrical Testing Marion and Fort Wayne
- Country
- United States
- Published
- October 20, 2025
- Deadline
- November 14, 2025
Description
{"description":"Clean, test, adjust, calibrate, inspect and retorque all the below mentioned electrical distribution apparatus. This shall include, but not be limited to, power transformers, switchgear, motor control centers, distribution centers, panel boards, air circuit breaker, vacuum circuit breakers, and loop switches listed in Attachment I SOW Attachments. Over-current testing apparatus shall be limited to over-current relays for each 15 KV and 5 KV circuit breaker. Megger voltage shall not exceed IEEE standards. No high pot voltage to be applied to feeder wires. All equipment will be isolated from panel and feeders during testing for proper data reading. No variance.\n\nContractor is responsible to reinstall equipment to original condition, verifying voltage, phasing and rotation. Any damage to equipment due to contractor neglect is the contractor s financial responsibility.\n\nRepairs outside this SOW will be at an additional charge to the VA and require prior approval from the COR and Contracting Officer before repairs are started.\n\n"} Solicitation Number: 36C25026Q0067 Type: Presolicitation Base Type: Presolicitation NAICS: 811210 Classification Code: H159 Response Deadline: 2025-11-14T10:00:00-05:00 Office Address: DAYTON, OH Place of Performance: Marion, Indiana, 46953 POC: Tiffany Rausch, tiffany.rausch@va.gov {"description":"Clean, test, adjust, calibrate, inspect and retorque all the below mentioned electrical distribution apparatus. This shall include, but not be limited to, power transformers, switchgear, motor control centers, distribution centers, panel boards, air circuit breaker, vacuum circuit breakers, and loop switches listed in Attachment I SOW Attachments. Over-current testing apparatus shall be limited to over-current relays for each 15 KV and 5 KV circuit breaker. Megger voltage shall not exceed IEEE standards. No high pot voltage to be applied to feeder wires. All equipment will be isolated from panel and feeders during testing for proper data reading. No variance.\n\nContractor is responsible to reinstall equipment to original condition, verifying voltage, phasing and rotation. Any damage to equipment due to contractor neglect is the contractor s financial responsibility.\n\nRepairs outside this SOW will be at an additional charge to the VA and require prior approval from the COR and Contracting Officer before repairs are started.\n\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.