Back to search
GETSNotice https://www.gets.govt.nz//DOC/ExternalTenderDetails.htm?id=32102730

Hollyford Track - Swamp Creek Bridge Replacement Project

Buyer
Department of Conservation
Country
New Zealand
Published
July 21, 2025
Deadline
August 26, 2025

Description

RFx ID: 32102730 Organisation: Department of Conservation Open date: Monday, 21 July 2025 12:00 PM +12:00 Close date: Tuesday, 26 August 2025 12:00 PM +12:00 Categories: 72000000 - Building and Facility Construction and Maintenance Services 95000000 - Land and Buildings and Structures and Thoroughfares Region: Southland Overview: The five-year SSI Flood Recovery Programme was stood up to repair and rebuild DOC infrastructure damaged following a severe flood event in February 2020. Swamp Creek Bridge was one such asset damaged. Although temporarily repaired as part of Tranche 1 of the Programme, full bridge replacement in a more resilient location is planned for Tranche 2. Swamp Creek Bridge (Fiordland National Park) is located on the Hollyford Track, approximately 45min walk from the trailhead on the Lower Hollyford Road. The Swamp Creek site previously had two bridges: the main 18m alloy truss bridge and a smaller steel truss bridge over an adjacent water channel. The 2020 floods destroyed the smaller steel truss bridge, but the 18m bridge was unaffected. However, the resilience of the existing bridge is relatively low, hence this project is a longer-term solution for this site. A Detailed Business Case (DBC) for this project was approved on 12 May 2025. It allows for the construction of a new, 59 m long Swamp Creek suspension bridge in a more resilient location. The existing bridge will be removed from site and repurposed at another yet to be determined location. The purpose of this procurement is to source a construction contractor to build a new Swamp Creek Bridge. The scope of the works is therefore to: 1) Supply and construction of the 59m span Swamp Creek suspension bridge (as per approved design and specifications), and 2) All associated establishment, disestablishment, and other works necessary to complete the bridge construction works (to the agreed design and specification). 3) Minor track works (to connect bridge to existing track). The five-year SSI Flood Recovery Programme was stood up to repair and rebuild DOC infrastructure damaged following a severe flood event in February 2020. Swamp Creek Bridge was one such asset damaged. Although temporarily repaired as part of Tranche 1 of the Programme, full bridge replacement in a more resilient location is planned for Tranche 2. Swamp Creek Bridge (Fiordland National Park) is located on the Hollyford Track, approximately 45min walk from the trailhead on the Lower Hollyford Road. The Swamp Creek site previously had two bridges: the main 18m alloy truss bridge and a smaller steel truss bridge over an adjacent water channel. The 2020 floods destroyed the smaller steel truss bridge, but the 18m bridge was unaffected. However, the resilience of the existing bridge is relatively low, hence this project is a longer-term solution for this site. A Detailed Business Case (DBC) for this project was approved on 12 May 2025. It allows for the construction of a new, 59 m long Swamp Creek suspension bridge in a more resilient location. The existing bridge will be removed from site and repurposed at another yet to be determined location. The purpose of this procurement is to source a construction contractor to build a new Swamp Creek Bridge. The scope of the works is therefore to: 1) Supply and construction of the 59m span Swamp Creek suspension bridge (as per approved design and specifications), and 2) All associated establishment, disestablishment, and other works necessary to complete the bridge construction works (to the agreed design and specification). 3) Minor track works (to connect bridge to existing track).

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Hollyford Track - Swamp Creek Bridge Replacement Project tender | Tenqual