TAMPA HARBOR, DREDGE MATERIAL MANAGEMENT AREA 3-D SITE IMPROVEMENTS AND MAINTENANCE, HILLSBOROUGH COUNTY, FLORIDA
- Country
- United States
- Published
- November 18, 2025
- Deadline
- December 12, 2025
Description
{"description":"The project consists of the construction of two new weir structures in the DMMA 3-D basin. The weir construction also includes associated concrete foundation, discharge pipes, filter drain and CLSM, helical anchors, mitered end sections, riprap outfall area, floating platform, gangway, and flap gate. Associated earthwork includes deconstruction of the existing dike in the vicinity of the new weirs; reconstruction of the dike; and construction of new earthwork features including ramps. The project also entails repair and stabilization of eroded sections of the existing exterior dike slope, including placement of fill, riprap, and sod. The gangway at the existing weirs is damaged and requires removal and replacement. The floating dock at the existing weirs requires modification to allow for proper operation (See Appendix A: Shop Drawings of Existing Weirs). Concrete repairs are also required at the existing weirs. "} Solicitation Number: W912EP26BA004 Type: Solicitation Base Type: Solicitation NAICS: 237990 Classification Code: Z1KF Response Deadline: 2025-12-12T13:00:00 Office Address: JACKSONVILLE, FL POC: NICOLE BATISTA-CRUZ, nicole.m.batista-cruz@usace.army.mil, 9042323275 POC: TIMOTHY HUMPHREY, Timothy.G.Humphrey@usace.army.mil, 9042321072 {"description":"The project consists of the construction of two new weir structures in the DMMA 3-D basin. The weir construction also includes associated concrete foundation, discharge pipes, filter drain and CLSM, helical anchors, mitered end sections, riprap outfall area, floating platform, gangway, and flap gate. Associated earthwork includes deconstruction of the existing dike in the vicinity of the new weirs; reconstruction of the dike; and construction of new earthwork features including ramps. The project also entails repair and stabilization of eroded sections of the existing exterior dike slope, including placement of fill, riprap, and sod. The gangway at the existing weirs is damaged and requires removal and replacement. The floating dock at the existing weirs requires modification to allow for proper operation (See Appendix A: Shop Drawings of Existing Weirs). Concrete repairs are also required at the existing weirs. "}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.