THEATER AIRCRAFT CORROSION CONTROL PREP HANGAR, KADENA AIR BASE, OKINAWA, JAPAN
- Country
- United States
- Published
- October 31, 2025
- Deadline
- January 6, 2026
Description
{"description":" PLEASE FOLLOW "PIEE Solicitation Module Link for W912HV25RA006" TO SEE SOLICITATION ATTACHMENTS \n\n **10/31/2025 Two For Information Only (FIO) attachments are added \n\n **10/30/2025 Added 1 For Information Only (FIO) document. Two (2) more FIO documents will be added on 10/31/2025 (having system issues). \n\n **AM-0001 is released on 09/18/2025. Follow the link to PIEE to see the atachments. \n\n ** 08/28/2025 Uploaded the following 5 attachments to SAM.gov: CCPH Pre Proposal Conference Slides, CCPH Site Visit contact sheet, Sign-in sheet Pre-proposal Conference, Sign-in sheet Site Visit, Sign-in sheet Site Visit 2. **08/08/2025 10:00 AM JST: 3 missing attachments were uploaded to PIEE - Section_00_22_00_Proposal_Submission_Requirements, Section_00_22_16_Evaluation_Criteria, and Class_JA_for_USAF_Brand_Name_HVAC__signed_Redacted. Please follow the link to PIEE under attachments. \n\n ***Original: \nThis project is to construct a corrosion control facility for painting large-bodied aircraft. The facility consists of a single bay paint booth, single bay prep/wash hangar, and support spaces for painting and sanding operations. \n"} Solicitation Number: W912HV25RA006 Type: Solicitation Base Type: Solicitation NAICS: 236220 Classification Code: Y1BZ Response Deadline: 2026-01-06T14:00:00+09:00 Office Address: APO, AP POC: Valeria Fisher, valeria.fisher@usace.army.mil, 098-970-9068 POC: Jack T. Letscher, Jack.T.Letscher@usace.army.mil, 0989704402 {"description":" PLEASE FOLLOW "PIEE Solicitation Module Link for W912HV25RA006" TO SEE SOLICITATION ATTACHMENTS \n\n **10/31/2025 Two For Information Only (FIO) attachments are added \n\n **10/30/2025 Added 1 For Information Only (FIO) document. Two (2) more FIO documents will be added on 10/31/2025 (having system issues). \n\n **AM-0001 is released on 09/18/2025. Follow the link to PIEE to see the atachments. \n\n ** 08/28/2025 Uploaded the following 5 attachments to SAM.gov: CCPH Pre Proposal Conference Slides, CCPH Site Visit contact sheet, Sign-in sheet Pre-proposal Conference, Sign-in sheet Site Visit, Sign-in sheet Site Visit 2. **08/08/2025 10:00 AM JST: 3 missing attachments were uploaded to PIEE - Section_00_22_00_Proposal_Submission_Requirements, Section_00_22_16_Evaluation_Criteria, and Class_JA_for_USAF_Brand_Name_HVAC__signed_Redacted. Please follow the link to PIEE under attachments. \n\n ***Original: \nThis project is to construct a corrosion control facility for painting large-bodied aircraft. The facility consists of a single bay paint booth, single bay prep/wash hangar, and support spaces for painting and sanding operations. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.