Back to search
TEDNotice 331603-2026

Construction of Nikšić Wastewater Management System – Sewerage Network Phase II

Buyer
Nikšić Municipality
Published
May 15, 2026
Deadline
April 28, 2026

Description

Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corrugated PE pipes is the collector’s material and concrete is the manhole material. - Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of Ø200 mm with a length of 165 m. The wastewater will be pumped through the pressure line to the existing pumping station "Duklo". - Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Construction of Nikšić Wastewater Management System – Sewerage Network Phase II tender | Tenqual