Back to search
TEDNotice 341591-2026

CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland

Buyer
RARIK ohf.
Published
May 19, 2026
Deadline
June 10, 2026

Description

The project comprises one work site; however, the cable installation is divided into two sections: firstly, a new main distribution cable installation and secondly, a cable intended to replace the existing overhead line. One pad-mounted substation shall be installed along the route. The scope of works includes installation of: six (6) single-core 1x240 mm² 36 kV high-voltage cables over approximately 10 km; and three (3) 150 mm² 24 kV high-voltage cables over approximately 7 km. Accordingly, a total of six to seven (6–7) cables shall be simultaneously ploughed and installed in parallel over an approximately 10 km section. The Purchaser also requests installation of fibre optic ducting in parallel with the works. It is anticipated that the works will commence on 10 August 2026 and be completed within 10 weeks thereafter. The commencement date may be delayed should the cables not arrive in Iceland in due time. In such event, the contract period shall be extended correspondingly to reflect the delay.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland tender | Tenqual