Back to search
SAM.govNotice 77fbc6aa7a6940ee89232d56c92379bd

B1825 LIGHTNING PROTECTION SYSTEM

Country
United States
Published
March 2, 2026
Deadline
March 19, 2026

Description

{"description":" This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air Force a hard copy and a digital CD of the acceptance testing results and the UL Lightning Protection Inspection Certificate for the facility. The UL Lightning Protection Inspection Certificate shall be certified to NFPA 780 Chapter 8. The Contractor shall have attended and completed the Senior Inspector AMMO 50 training or equivalent. \n\n Please See attached SOW for complete details. \n"} Solicitation Number: FA462626Q0008 Type: Solicitation Base Type: Solicitation NAICS: 238290 Classification Code: J062 Response Deadline: 2026-03-19T13:00:00-06:00 Office Address: MALMSTROM AFB, MT Place of Performance: Malmstrom AFB, Montana, 59402 POC: Jeffrey Krieger, jeffrey.krieger@us.af.mil, 4067314014 POC: Charles McClintic, charles.mcclintic@us.af.mil, 4067314463 {"description":" This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air Force a hard copy and a digital CD of the acceptance testing results and the UL Lightning Protection Inspection Certificate for the facility. The UL Lightning Protection Inspection Certificate shall be certified to NFPA 780 Chapter 8. The Contractor shall have attended and completed the Senior Inspector AMMO 50 training or equivalent. \n\n Please See attached SOW for complete details. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
B1825 LIGHTNING PROTECTION SYSTEM tender | Tenqual