Z2DA--657-18-115JCA, CON: Replace Various Air Handling Units and Variable Air Volume Units (VA-26-00026953)
- Country
- United States
- Published
- February 5, 2026
Description
{"description":"\n\nProject 657-18-115JC Replace Various AHU and VAV\nVA Saint Louis Health Care System John Cochran Division\n\nThe Department of Veterans Affairs, Network Contracting Office (NCO) 15, has a requirement to Replace Various Air Handling Units and Variable Air Volume Units, project number 657-18-115JCA, located at the U.S Department of Veterans Affairs, VA St. Louis Health Care System, John Cochran Division, 915 North Grand Boulevard, St. Louis, MO 63106\n\nThe following narrative is intended to provide an overview of the scope of work for the proposed project. \nPROJECT DESCRIPTION AND SCOPE\n1. Purpose of Project\nThe VA Saint Louis Health Care System, John Cochran Division, requires the services of a Construction Contractor to replace various Air Handling Units (AHUs) and Variable Air Volume (VAV) Units in Building 1 of the main hospital. This effort includes the disconnection and removal of existing HVAC equipment, installation and placement of new equipment, maintenance of HVAC services for occupied spaces during replacement activities, hazardous material abatement, and restoration of construction-affected spaces for patient care. Work will be executed in accordance with the project drawings and specifications, which have been developed by an Architectural-Engineering firm. These documents detail the scope and standards for the work to be performed in addition to any supplemental information provided in this document.\n2. Scope of Work\nThe work under this contract includes general construction, alterations, mechanical and electrical work, utility systems, demolition and removal of structures, and associated tasks required for project completion. The contractor shall furnish all supervision, labor, tools, materials, equipment, transportation, and testing necessary to fully execute the project. Specific tasks to be completed include:\nInstallation of Government-Furnished Equipment (GFE):\nFan Coil Units (34), categorized as:\nType A: 11\nType B: 16\nType C: 2\nType D: 3\nType E: 2\nAir Terminal Units (12).\nAir Handling Unit 57 (1).\nCondensate Pump (1).\nDuctwork for 6 South (as specified in project drawings).\nContractor to inspect and assess GFE to determine additional equipment requirements and include the cost of procurement in their bid. Any additional equipment needed to complete the project as delineated in these documents shall be furnished at no additional cost to the government. \nSpecific equipment information provided in equipment schedule\nContractor to provide 1 year warranty for all equipment both GFE and CPE from date of beneficial occupancy. \nCoordination and Site Preparation:\nPerform site investigations to assess conditions and limitations.\nRelocate utilities or fixtures as necessary to ensure full functionality of the new HVAC equipment.\nCoordinate all ward or room closures with VA staff. Ward closures need to be sequential with time for activation and de-activation activities between closures. \nConstruction Activities:\nLay out supply and return ductwork to Air Handling Unit 57 to preserve maintenance access or provide compliant access mechanisms.\nRemove and replace existing drop ceilings within all corridors in the construction area. Remove and replace existing drop ceilings as needed in other rooms as needed per the COR in the construction area.\nEnsure all walls affected by construction activities are finished to a Level 4 standard, adhering to industry guidelines.\nMechanical and Structural Requirements:\nInstall gravity-type drain pans with connections to existing drain lines. Condensate pumps will not be allowed.\nReplace any leaking valves.\nFurniture and Equipment Protection:\nThe VA will move some, but not all equipment within the construction area. Any equipment or furniture left within the construction area shall be protected. Contractor option to move and store furniture and equipment off site at no additional cost to the government or wrap in plastic and securely store any equipment and furniture within the work area. Furniture and equipment must be cleaned per Infection Preventions standards at the end of the construction period. Any rooms not affected by construction activity shall be sealed off per IP standards.\nContainment and Infection Control:\nConstruct Infection Control Risk Assessment (ICRA) barriers outside normal hospital operating hours.\nPerform work within containment zones during daytime hours to minimize noise disturbance to inpatient wards above.\nCoordination With Hospital Operations:\nNotify the project manager of any utility shutdowns at least 21 Federal Working days in advance and coordinate access to the work site for hospital maintenance staff and other contractors as needed.\nExecute all activities in a manner that minimizes disruptions to patient care and hospital operations. COR reserves the right to determine disruptive activities.\nSince the contractor will be allowed to shut down one entire ward at one time, the VA reserves the right to determine what time of year this will happen. Any delays to the timing of when the ward can be shut down will be at no additional cost to the government. Any delays to the timing of when ancillary areas outside the ward can be shut down will be at no additional cost to the government.\n3. Applicable Criteria\nAll work shall comply with the terms and conditions of the project specifications and drawings, VA Technical Information Library (TIL) standards, and local and national codes. Additionally, the contractor must adhere to all VA-stipulated COVID-19 requirements and other regulatory health and safety obligations. The following criteria apply:\nWorking hours and restricted access conditions as outlined in the project documents. Work on Federal Holidays Is prohibited. \nInfection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) requirements.\nHazardous materials abatement protocols.\nAllowable storage locations for contractor equipment and materials as specified in the drawings.\nThere is no storage available on the VA campus. The contractor is not allowed to store any material outside of the IP approved construction barrier.\nThere are portions of the work required on the project drawings that have already been completed. Those portions are annotated on the drawings. The applicable work for this project is located on the 6th Floor A section, the 7th floor A Section, the 10th floor utility room, and the hospital roof. \nThis Statement of Work (SOW) is intended as an outline and is not a detailed summary of the work the contractor will be required to perform. In the event of conflict between this SOW and the project drawings and specifications, the drawings and specifications will take precedence over this SOW.\n\nThe estimated project cost range to complete this work is between $2,000,000.00 and $5,000,000.00. \nPursuant to 38 USC 8127(d) and in accordance with Public Law 109-461, the Veterans Benefits, Health Care and Information Technology Act of 2006, this construction project will be solicited as a Total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The North American Industry Classification Code (NAICS) for this procurement is 238220 Plumbing, Heating, and Air-Conditioning Contractors, with a small business size standard of $19.0 million. Contract Type: Firm Fixed. The duration of the project is estimated to be 275 calendar days from Notice to Proceed. This completion period includes final inspection and cleanup of the premises. Award will be made utilizing Best Value Source Selection Process in accordance with Federal Acquisition Regulation Part 15. Proposal submission instructions will be included in the solicitation package. The government plans to award without discussions. The offeror is responsible to monitor and download any amendments from the Contract Opportunities (https:// sam.gov) website, which may be issued to this solicitation. \nIn accordance with FAR 52.204-7, Required SAM, and in accordance with Veterans Affairs Acquisition Regulation (VAAR) 802.101, prospective contractors must be registered in SAM and in the Veteran Small Business Certification (sba.gov) databases under the applicable NAICS. Firms may obtain SAM information at http://www.sam.gov and Veteran Small Business Certification (sba.gov) information at https://veterans.certify.sba.gov\nThe solicitation package with project specifications and drawings should be available for download on or about February 25, 2026 and the proposal due date will be on or about April 16, 2026. An organized site visit will be scheduled and specific date and time will be made available at time of solicitation issuance. Only one site visit will be scheduled and interested offerors are highly encouraged to attend. No hard copies of the solicitation or drawings will be provided; and telephone requests or questions will NOT be accepted. \nPlease email requests or questions to David.Sterrett@va.gov and ensure that the subject line reads \" Replace Various Air Handling Units and Variable Air Volume Units, Project Number 657-18-115JCA; Solicitation Number: 36C25526R0070. \n\n"} Solicitation Number: 36C25526R0070 Type: Presolicitation Base Type: Presolicitation NAICS: 238220 Classification Code: Z2DA Office Address: LEAVENWORTH, KS Place of Performance: St. Louis, MO, 63106-1621 POC: David Sterrett, david.sterrett@va.gov, (913) 946-1146 {"description":"\n\nProject 657-18-115JC Replace Various AHU and VAV\nVA Saint Louis Health Care System John Cochran Division\n\nThe Department of Veterans Affairs, Network Contracting Office (NCO) 15, has a requirement to Replace Various Air Handling Units and Variable Air Volume Units, project number 657-18-115JCA, located at the U.S Department of Veterans Affairs, VA St. Louis Health Care System, John Cochran Division, 915 North Grand Boulevard, St. Louis, MO 63106\n\nThe following narrative is intended to provide an overview of the scope of work for the proposed project. \nPROJECT DESCRIPTION AND SCOPE\n1. Purpose of Project\nThe VA Saint Louis Health Care System, John Cochran Division, requires the services of a Construction Contractor to replace various Air Handling Units (AHUs) and Variable Air Volume (VAV) Units in Building 1 of the main hospital. This effort includes the disconnection and removal of existing HVAC equipment, installation and placement of new equipment, maintenance of HVAC services for occupied spaces during replacement activities, hazardous material abatement, and restoration of construction-affected spaces for patient care. Work will be executed in accordance with the project drawings and specifications, which have been developed by an Architectural-Engineering firm. These documents detail the scope and standards for the work to be performed in addition to any supplemental information provided in this document.\n2. Scope of Work\nThe work under this contract includes general construction, alterations, mechanical and electrical work, utility systems, demolition and removal of structures, and associated tasks required for project completion. The contractor shall furnish all supervision, labor, tools, materials, equipment, transportation, and testing necessary to fully execute the project. Specific tasks to be completed include:\nInstallation of Government-Furnished Equipment (GFE):\nFan Coil Units (34), categorized as:\nType A: 11\nType B: 16\nType C: 2\nType D: 3\nType E: 2\nAir Terminal Units (12).\nAir Handling Unit 57 (1).\nCondensate Pump (1).\nDuctwork for 6 South (as specified in project drawings).\nContractor to inspect and assess GFE to determine additional equipment requirements and include the cost of procurement in their bid. Any additional equipment needed to complete the project as delineated in these documents shall be furnished at no additional cost to the government. \nSpecific equipment information provided in equipment schedule\nContractor to provide 1 year warranty for all equipment both GFE and CPE from date of beneficial occupancy. \nCoordination and Site Preparation:\nPerform site investigations to assess conditions and limitations.\nRelocate utilities or fixtures as necessary to ensure full functionality of the new HVAC equipment.\nCoordinate all ward or room closures with VA staff. Ward closures need to be sequential with time for activation and de-activation activities between closures. \nConstruction Activities:\nLay out supply and return ductwork to Air Handling Unit 57 to preserve maintenance access or provide compliant access mechanisms.\nRemove and replace existing drop ceilings within all corridors in the construction area. Remove and replace existing drop ceilings as needed in other rooms as needed per the COR in the construction area.\nEnsure all walls affected by construction activities are finished to a Level 4 standard, adhering to industry guidelines.\nMechanical and Structural Requirements:\nInstall gravity-type drain pans with connections to existing drain lines. Condensate pumps will not be allowed.\nReplace any leaking valves.\nFurniture and Equipment Protection:\nThe VA will move some, but not all equipment within the construction area. Any equipment or furniture left within the construction area shall be protected. Contractor option to move and store furniture and equipment off site at no additional cost to the government or wrap in plastic and securely store any equipment and furniture within the work area. Furniture and equipment must be cleaned per Infection Preventions standards at the end of the construction period. Any rooms not affected by construction activity shall be sealed off per IP standards.\nContainment and Infection Control:\nConstruct Infection Control Risk Assessment (ICRA) barriers outside normal hospital operating hours.\nPerform work within containment zones during daytime hours to minimize noise disturbance to inpatient wards above.\nCoordination With Hospital Operations:\nNotify the project manager of any utility shutdowns at least 21 Federal Working days in advance and coordinate access to the work site for hospital maintenance staff and other contractors as needed.\nExecute all activities in a manner that minimizes disruptions to patient care and hospital operations. COR reserves the right to determine disruptive activities.\nSince the contractor will be allowed to shut down one entire ward at one time, the VA reserves the right to determine what time of year this will happen. Any delays to the timing of when the ward can be shut down will be at no additional cost to the government. Any delays to the timing of when ancillary areas outside the ward can be shut down will be at no additional cost to the government.\n3. Applicable Criteria\nAll work shall comply with the terms and conditions of the project specifications and drawings, VA Technical Information Library (TIL) standards, and local and national codes. Additionally, the contractor must adhere to all VA-stipulated COVID-19 requirements and other regulatory health and safety obligations. The following criteria apply:\nWorking hours and restricted access conditions as outlined in the project documents. Work on Federal Holidays Is prohibited. \nInfection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) requirements.\nHazardous materials abatement protocols.\nAllowable storage locations for contractor equipment and materials as specified in the drawings.\nThere is no storage available on the VA campus. The contractor is not allowed to store any material outside of the IP approved construction barrier.\nThere are portions of the work required on the project drawings that have already been completed. Those portions are annotated on the drawings. The applicable work for this project is located on the 6th Floor A section, the 7th floor A Section, the 10th floor utility room, and the hospital roof. \nThis Statement of Work (SOW) is intended as an outline and is not a detailed summary of the work the contractor will be required to perform. In the event of conflict between this SOW and the project drawings and specifications, the drawings and specifications will take precedence over this SOW.\n\nThe estimated project cost range to complete this work is between $2,000,000.00 and $5,000,000.00. \nPursuant to 38 USC 8127(d) and in accordance with Public Law 109-461, the Veterans Benefits, Health Care and Information Technology Act of 2006, this construction project will be solicited as a Total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The North American Industry Classification Code (NAICS) for this procurement is 238220 Plumbing, Heating, and Air-Conditioning Contractors, with a small business size standard of $19.0 million. Contract Type: Firm Fixed. The duration of the project is estimated to be 275 calendar days from Notice to Proceed. This completion period includes final inspection and cleanup of the premises. Award will be made utilizing Best Value Source Selection Process in accordance with Federal Acquisition Regulation Part 15. Proposal submission instructions will be included in the solicitation package. The government plans to award without discussions. The offeror is responsible to monitor and download any amendments from the Contract Opportunities (https:// sam.gov) website, which may be issued to this solicitation. \nIn accordance with FAR 52.204-7, Required SAM, and in accordance with Veterans Affairs Acquisition Regulation (VAAR) 802.101, prospective contractors must be registered in SAM and in the Veteran Small Business Certification (sba.gov) databases under the applicable NAICS. Firms may obtain SAM information at http://www.sam.gov and Veteran Small Business Certification (sba.gov) information at https://veterans.certify.sba.gov\nThe solicitation package with project specifications and drawings should be available for download on or about February 25, 2026 and the proposal due date will be on or about April 16, 2026. An organized site visit will be scheduled and specific date and time will be made available at time of solicitation issuance. Only one site visit will be scheduled and interested offerors are highly encouraged to attend. No hard copies of the solicitation or drawings will be provided; and telephone requests or questions will NOT be accepted. \nPlease email requests or questions to David.Sterrett@va.gov and ensure that the subject line reads \" Replace Various Air Handling Units and Variable Air Volume Units, Project Number 657-18-115JCA; Solicitation Number: 36C25526R0070. \n\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.