BKP 230 Electrical Installations | Extension of Gymnasiums TBS5, Weinfelden
- Buyer
- Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
- Published
- December 2, 2025
Description
Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension Electrical Systems: Lighting will be implemented with LED fixtures to provide energy-efficient illumination. Automatic lighting controls and shading systems will contribute to optimized operation. Photovoltaics: The entire roof surface will be covered with photovoltaic modules to maximize solar potential. The building will be fully supplied with electricity from this yield, and it will also provide a significant power contribution to the existing school, where the surplus electricity will be fed in.
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.