Back to search
SAM.govNotice 955aa1dbaec4409299f53a402cbb0da0

Buffalo Creek Boiler Replacement

Country
United States
Published
March 4, 2026
Deadline
March 13, 2026

Description

{"description":" Project: Buffalo Creek Boiler Replacement \n\n POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov \n\n \n\n for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D- Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F- Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation. \n\n Magnitude of Construction is between $25,000 and $100,000 \n\n Site Visit: \n\n P.O.C. Name: Corey Lewenkamp \n\n Address: 18046 CO RD 126 Pine CO, 80470 \n\n Date and Time: February 25, 2026, 1:00 PM Mountain \n\n Telephone: 719-744-7196 \n\n P.O.C. Email: corey.lewenkamp@usda.gov \n\n Attachment 1 Solicitation Terms and Conditions \n\n Attachment 2 SOI \n\n Attachment 3 SOW \n\n Attachment 4 BCWC Dwelling Mech & Elec Systems Info \n\n Attachment 5- Product Specs \n\n Attachment 6- Wage Determination \n\n Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time. \n\n Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026. \n\n \n"} Solicitation Number: 1240LT26C0020 Type: Combined Synopsis/Solicitation Base Type: Combined Synopsis/Solicitation NAICS: 238220 Classification Code: J045 Response Deadline: 2026-03-13T12:00:00-05:00 Office Address: PUEBLO, CO Place of Performance: Pine, Colorado, 80470 POC: Erick Plamann, erick.plamann@usda.gov POC: Lucas Dahlman, lucas.dahlman@usda.gov {"description":" Project: Buffalo Creek Boiler Replacement \n\n POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov \n\n \n\n for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D- Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F- Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation. \n\n Magnitude of Construction is between $25,000 and $100,000 \n\n Site Visit: \n\n P.O.C. Name: Corey Lewenkamp \n\n Address: 18046 CO RD 126 Pine CO, 80470 \n\n Date and Time: February 25, 2026, 1:00 PM Mountain \n\n Telephone: 719-744-7196 \n\n P.O.C. Email: corey.lewenkamp@usda.gov \n\n Attachment 1 Solicitation Terms and Conditions \n\n Attachment 2 SOI \n\n Attachment 3 SOW \n\n Attachment 4 BCWC Dwelling Mech & Elec Systems Info \n\n Attachment 5- Product Specs \n\n Attachment 6- Wage Determination \n\n Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time. \n\n Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026. \n\n \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Buffalo Creek Boiler Replacement tender | Tenqual