Back to search
SAM.govNotice ed569d9e236b461a8f1a544a0e5a9605

Byron White Courthouse Barrier Replacement

Country
United States
Published
February 24, 2026
Deadline
March 6, 2026

Description

{"description":" This project is a total small business set a side. \n\n The General Services Administration is intiating a design build project to demolish and remove the existing Delta wedge barriers at the garage entrace and exit location located at the Bryon White Courthouse. Upon complete removal of the wedge barriers and components, installation of Hysecurity StrongArm M30 and M50 barriers shall be installed to provide a secure environment to the garage. Currently the existing wedge barriers are inoperable due to current power issues and heavy rust corrosion. The existing setup also does not include safety devices to ensure the safe operation of the wedge barriers to life and property. The USMS require Hysecurity Strong Arm drop arm to provide acceptable operation due to the environmental conditions and proven operation. \n\n This project includes a design and construction of a new Active behicular barrier (AVB) system and supporting infrastructure at the garage entrace and exist. Only electrical contractor is required to be USMS approved. \n\n \n"} Solicitation Number: EQ8PSCC-25-0023 Type: Presolicitation Base Type: Presolicitation NAICS: 236220 Classification Code: Z2AA Response Deadline: 2026-03-06T16:00:00-08:00 Office Address: LAKEWOOD, CO Place of Performance: Denver, Colorado POC: Corey J Roundfield, corey.roundfield@gsa.gov, 7206560243 {"description":" This project is a total small business set a side. \n\n The General Services Administration is intiating a design build project to demolish and remove the existing Delta wedge barriers at the garage entrace and exit location located at the Bryon White Courthouse. Upon complete removal of the wedge barriers and components, installation of Hysecurity StrongArm M30 and M50 barriers shall be installed to provide a secure environment to the garage. Currently the existing wedge barriers are inoperable due to current power issues and heavy rust corrosion. The existing setup also does not include safety devices to ensure the safe operation of the wedge barriers to life and property. The USMS require Hysecurity Strong Arm drop arm to provide acceptable operation due to the environmental conditions and proven operation. \n\n This project includes a design and construction of a new Active behicular barrier (AVB) system and supporting infrastructure at the garage entrace and exist. Only electrical contractor is required to be USMS approved. \n\n \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Byron White Courthouse Barrier Replacement tender | Tenqual