FCI Jesup Water Mian Tie-in 23Z3AH7
- Country
- United States
- Published
- December 12, 2025
- Deadline
- January 13, 2026
Description
{"description":" The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW and drawings for further details. All work must comply with local, state, and federal regulations. Full and Open Competition, no set-aside. Evaluation factors; Lowest Price Technically Acceptable (LPTA) and past performance. A Pre-Bid site visit will take place at FCI Jesup on Tuesday, January 6, 2026, at 9:00 am EST. \n"} Solicitation Number: 15BBNF26Q00000012 Type: Solicitation Base Type: Solicitation NAICS: 237110 Classification Code: Z2FF Response Deadline: 2026-01-13T14:00:00-06:00 Office Address: GRAND PRAIRIE, TX Place of Performance: Jesup, Georgia, 31599 POC: Steven Dennison, sdennison@bop.gov, 7197845744 {"description":" The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW and drawings for further details. All work must comply with local, state, and federal regulations. Full and Open Competition, no set-aside. Evaluation factors; Lowest Price Technically Acceptable (LPTA) and past performance. A Pre-Bid site visit will take place at FCI Jesup on Tuesday, January 6, 2026, at 9:00 am EST. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.