Back to search
SAM.govNotice 57849c1294db4c7f9b6fc1de866880e2

Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD DISTRICT, OR

Country
United States
Published
February 9, 2026
Deadline
February 23, 2026

Description

{"description":"Medford Hot Water Heater Replacement, BLM Medford District, Oregon This notice is posted in accordance with Federal Acquisition Regulation (FAR) 36.213-2 Pre-solicitation Notices and FAR 36.204 Disclosure of the Magnitude of Construction Projects. The Bureau of Land Management (BLM), Oregon State Office intends to issue a Request for Proposal for a firm-fixed price construction contract for Medford Hot Water Heater Replacement, BLM Medford District, OR. Work shall include replacing the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heaters; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel. The magnitude of this construction project is between $30,000.00 and $40,000.00. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the contractor receives the notice to proceed. The solicitation will be issued as a total Small Business set aside under NAICS code 238220 ¿ Plumbing, Heating, and Air-Conditioning Contractors, and size standard $19 million. One or more of the items under this acquisition is subject to Buy American-Construction Materials. The basis of award will utilize the best value continuum -- lowest price technically acceptable source selection process in accordance with FAR subpart 15.101-2 to result in an award to the responsible offeror pursuant to FAR subpart 9.1. The technical/non-price evaluation factor(s) are Relevant Experience where technical/non-price evaluation factors, when combined, are significantly more important than price. The solicitation is anticipated to be issued on or about 25 February 2026. All responsible Small Business sources may submit a proposal which shall be considered by the agency. You may direct questions about this solicitation to the contract specialist Holand Nordholm at hnordholm@blm.gov. "} Solicitation Number: 140L4326R0003 Type: Presolicitation Base Type: Presolicitation NAICS: 238220 Classification Code: Z2EB Response Deadline: 2026-02-23T12:00:00-08:00 Office Address: PORTLAND, OR POC: Nordholm, Holand, hnordholm@blm.gov, 60290655160 {"description":"Medford Hot Water Heater Replacement, BLM Medford District, Oregon This notice is posted in accordance with Federal Acquisition Regulation (FAR) 36.213-2 Pre-solicitation Notices and FAR 36.204 Disclosure of the Magnitude of Construction Projects. The Bureau of Land Management (BLM), Oregon State Office intends to issue a Request for Proposal for a firm-fixed price construction contract for Medford Hot Water Heater Replacement, BLM Medford District, OR. Work shall include replacing the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heaters; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel. The magnitude of this construction project is between $30,000.00 and $40,000.00. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the contractor receives the notice to proceed. The solicitation will be issued as a total Small Business set aside under NAICS code 238220 ¿ Plumbing, Heating, and Air-Conditioning Contractors, and size standard $19 million. One or more of the items under this acquisition is subject to Buy American-Construction Materials. The basis of award will utilize the best value continuum -- lowest price technically acceptable source selection process in accordance with FAR subpart 15.101-2 to result in an award to the responsible offeror pursuant to FAR subpart 9.1. The technical/non-price evaluation factor(s) are Relevant Experience where technical/non-price evaluation factors, when combined, are significantly more important than price. The solicitation is anticipated to be issued on or about 25 February 2026. All responsible Small Business sources may submit a proposal which shall be considered by the agency. You may direct questions about this solicitation to the contract specialist Holand Nordholm at hnordholm@blm.gov. "}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD DISTRICT, OR tender | Tenqual