Back to search
SAM.govNotice 1add18b80a694f658ca58a6187009002

TOUCHDOWN 08 - REPLACEMENT

Country
United States
Published
January 23, 2026
Deadline
February 6, 2026

Description

{"description":"The U.S. Army Corps of Engineers (USACE), through its Middle East District (SWM), is evaluating the ability of businesses to perform a comprehensive pavement repair by removal of 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement, to include transitions, and replace with modified-heavy load concrete pavement on the Touchdown 08 end of Runway 08/26. Pavement will support modified-heavy load aircraft landing operations. Repair shall include concrete extension of the touchdown zone to meet current mission-assigned platform requirements by replacing 13,354 SM of asphaltic concrete pavement of runway with PCC. Additionally, repair by replacement of threshold lighting infrastructure and those taxiways exit lighting infrastructure that are within the concrete touchdown. Work will include all necessary airfield markings on the touchdown zone. In addition, the Contractor will be responsible for the work associated with the Aircraft Arresting System (AAS) Absorber Shelters. This project will comply with applicable International Civil Aviation Organization (ICAO) standards. *****This announcement seeks information from industry, which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. ****** "} Solicitation Number: W912ER26RA014 Type: Sources Sought Base Type: Sources Sought NAICS: 237310 Classification Code: Z2BD Response Deadline: 2026-02-06T12:00:00-05:00 Office Address: WINCHESTER, VA POC: Jerry Andes, jerry.o.andes@usace.army.mil, 5406653777 {"description":"The U.S. Army Corps of Engineers (USACE), through its Middle East District (SWM), is evaluating the ability of businesses to perform a comprehensive pavement repair by removal of 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement, to include transitions, and replace with modified-heavy load concrete pavement on the Touchdown 08 end of Runway 08/26. Pavement will support modified-heavy load aircraft landing operations. Repair shall include concrete extension of the touchdown zone to meet current mission-assigned platform requirements by replacing 13,354 SM of asphaltic concrete pavement of runway with PCC. Additionally, repair by replacement of threshold lighting infrastructure and those taxiways exit lighting infrastructure that are within the concrete touchdown. Work will include all necessary airfield markings on the touchdown zone. In addition, the Contractor will be responsible for the work associated with the Aircraft Arresting System (AAS) Absorber Shelters. This project will comply with applicable International Civil Aviation Organization (ICAO) standards. *****This announcement seeks information from industry, which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. ****** "}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
TOUCHDOWN 08 - REPLACEMENT tender | Tenqual