Rosebud Lift Station Construction
- Country
- United States
- Published
- February 11, 2026
- Deadline
- March 2, 2026
Description
{"description":" Amendment 2 : Adds the provision 52.228-1 in full text. \n\n Added MB01-A02 Bid Bond RLSC 75H70126R00018 to the attachments. \n\n Remember to acknowledge this and all future amendments with your proposal. \n\n \n\n Amendment 1 : Replace an attachment. \n\n Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or \nconcerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment. \n\n Remember to acknowledge this and all future amendments with your proposal. \n\n \n\n Solicitation : Rosebud LiftStation Construction \n\n Location : 1319 Soldier Creek Road,Rosebud, SD 57570 \n County : Todd \n POP : 120 calendar days \n Construction Magnitude : Between$500,000 and $1,000,000 \n Contract Type : firm-fixed-priced \n TERO : TERO is applicable. See SectionH.50. \n\n Goal : The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. \n\n A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. \n\n This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment. \n"} Solicitation Number: 75H70126R00018 Type: Solicitation Base Type: Solicitation NAICS: 237110 Classification Code: Y1ND Response Deadline: 2026-03-02T14:00:00-08:00 Office Address: SEATTLE, WA Place of Performance: Rosebud, South Dakota, 57570 POC: Daniel Cotto, daniel.cotto@ihs.gov, 2404617841 POC: Andrew E. Hart, andrew.hart@ihs.gov, 206-375-4443 {"description":" Amendment 2 : Adds the provision 52.228-1 in full text. \n\n Added MB01-A02 Bid Bond RLSC 75H70126R00018 to the attachments. \n\n Remember to acknowledge this and all future amendments with your proposal. \n\n \n\n Amendment 1 : Replace an attachment. \n\n Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or \nconcerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment. \n\n Remember to acknowledge this and all future amendments with your proposal. \n\n \n\n Solicitation : Rosebud LiftStation Construction \n\n Location : 1319 Soldier Creek Road,Rosebud, SD 57570 \n County : Todd \n POP : 120 calendar days \n Construction Magnitude : Between$500,000 and $1,000,000 \n Contract Type : firm-fixed-priced \n TERO : TERO is applicable. See SectionH.50. \n\n Goal : The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. \n\n A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. \n\n This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.