Back to search
SAM.govNotice 0462b2ef8dd34205acfce8209a0df036

Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76

Country
United States
Published
November 28, 2025
Deadline
December 17, 2025

Description

{"description":" Abate Asbestos Pipe Insulation – B76 \n\n 528A6-26-611 \n\n GENERAL PROJECT WORK SCOPE DESCRIPTION \n\n Existing Conditions: \n\n The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday – Friday 8:00am – 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. \n\n Contractor shall have 30 days from the “Notice to Proceed” to complete all work. \n"} Solicitation Number: 36C24226B0021 Type: Solicitation Base Type: Solicitation NAICS: 562910 Classification Code: Y1DA Response Deadline: 2025-12-17T12:30:00-05:00 Office Address: ALBANY, NY POC: Devan Bertch, Devan.Bertch@va.gov {"description":" Abate Asbestos Pipe Insulation – B76 \n\n 528A6-26-611 \n\n GENERAL PROJECT WORK SCOPE DESCRIPTION \n\n Existing Conditions: \n\n The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday – Friday 8:00am – 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. \n\n Contractor shall have 30 days from the “Notice to Proceed” to complete all work. \n"}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76 tender | Tenqual