Back to search
TEDNotice 588386-2025

Prequalification phase sub-contract 07 Foundation and foundation for CO2 terminal.

Buyer
HAFSLUND CELSIO AS
Published
September 9, 2025

Description

A complete CO2 shipping terminal shall be constructed at the Oslo Port in connection with the establishment of the carbon capture facility at Klemetsrud. The terminal will i.a. consist of CO2 unloading stations, storage tanks and loading arms for loading ships. Comprehensive civil work is required for this project. A Joint Venture between Aker Solutions and SLB Capturi will through its EPCIC contract with Hafslund Celsio be the Contract Manager (hereafter called the EPCIC supplier). The following work is included in the delivery: Rigging and operation, general servicesFounds and foundations Pipes in the groundBetong workExtro-installationsDoor ́s foundations for process equipmentPorts and fence participation in systematic completion led by the EPCIC supplier List above is not exhaustive, but covers the most important elements in the sub-contract.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Prequalification phase sub-contract 07 Foundation and foundation for CO2 terminal. tender | Tenqual