UPS battery backup
- Country
- United States
- Published
- February 17, 2026
- Deadline
- March 9, 2026
Description
{"description":" Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. \n\n Solicitation and attachment are posted below. \n\n Photos of room and equipment posted below. \n\n RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs. \n"} Solicitation Number: 12639526Q0042 Type: Solicitation Base Type: Solicitation NAICS: 238210 Classification Code: Y1JZ Response Deadline: 2026-03-09T11:00:00-06:00 Office Address: MINNEAPOLIS, MN Place of Performance: Fort Collins, Colorado, 80521 POC: Jim Roloff, james.g.roloff@usda.gov, 6125907603 {"description":" Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. \n\n Solicitation and attachment are posted below. \n\n Photos of room and equipment posted below. \n\n RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs. \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.