Back to search
TEDNotice 451211-2025

FCC/117/25.F Multi-Party Framework Agreement for the Provision of Engineering Consultancy Services for Bridge Rehabilitation, Assessments, and Inspections (2025–2029) – Fingal County Council

Buyer
Fingal County Council_371
Published
July 12, 2025

Description

Fingal County Council (FCC) seeks to establish a multi-party framework for engineering consultancy services for bridge rehabilitation, including project design, contract documentation, administration, supervision, assessments, and inspections of non-national road structures (road bridges, retaining walls, footbridges, culverts, etc.). Scope of Services: • Bridge Assessments: Bridge Inventory Surveys (BIS), Maintenance Inspections (MI), Engineering Inspections (EI), and Principal Inspections in accordance with BAMS and TII guidelines. • Rehabilitation Works: Detailed repair design for damaged structures, including strengthening, widening, concrete repairs, protective coatings, and parapet replacements. Prepare cost estimates of the works requried. • Emergency Repairs: Attend damaged bridge sites within 24 hours, conduct inspections, and prepare technical reports, structural analysis, and bills of quantities. • Surveys and Reports: Procure topographical and GPR surveys, AA and EIAR screening reports, bat/bird surveys and ecological surveys, hydrological reports; preparation of draft and final Principal Inspection reports with Executive Summaries. • Data Management: Upload inspection results and data to MapRoad and BAMS systems; prepare executive summaries with bridge prioritization. • Project Delivery: Full ownership from preliminary design through to construction monitoring, snagging, and handover (Stages 1–5). • Liaison: Coordinate with internal FCC departments, OPW, Inland Fisheries, NPWS, and other statutory bodies. • Health and Safety: Fulfil Designer and PSDP duties under Construction Regulations 2013. • Documentation: Submit reports, drawings, and other documentation in complete approved PDF format; take and distribute detailed meeting minutes. • Project Management: Appoint a dedicated Team Leader; manage staff changes with FCC approval; provide fully resourced project programmes within 7 days of appointment. • Quality Assurance: Include for technical advice, modern technologies, liaison with third parties, and adherence to evolving Health and Safety protocols in tendered rates. A detailed specification will be provided as stage 2 of the process

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
FCC/117/25.F Multi-Party Framework Agreement for the Provision of Engineering Consultancy Services for Bridge Rehabilitation, Assessments, and Inspections (2025–2029) – Fingal County Council tender | Tenqual