Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentati…
- Country
- United States
- Published
- January 12, 2026
- Deadline
- March 1, 2026
Description
{"description":" This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. \nThe work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. \n\n This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. Onsite work tentatively begins 6/1/2026. Contract time is 165 days. \n \n"} Solicitation Number: 1240LT26Q0005 Type: Presolicitation Base Type: Presolicitation NAICS: 236220 Classification Code: Y1PA Response Deadline: 2026-03-01T17:00:00-07:00 Office Address: Ogden, UT Place of Performance: Idaho POC: Terri Tucker, terri.tucker@usda.gov {"description":" This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. \nThe work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. \n\n This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. Onsite work tentatively begins 6/1/2026. Contract time is 165 days. \n \n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.