Description

{"description":"The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible. "} Solicitation Number: W911S226RA005 Type: Sources Sought Base Type: Sources Sought NAICS: 541330 Classification Code: C1EA Response Deadline: 2026-01-30T15:00:00-05:00 Office Address: FORT DRUM, NY Place of Performance: 24141 POC: Lyndsie Hall, lyndsie.j.hall.civ@army.mil, 520-852-1859 POC: A. Milan Sanchez, alfredo.m.sanchez.civ@army.mil, 520-852-1469 {"description":"The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible. "}

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities tender | Tenqual