Back to search
GETSNotice https://www.gets.govt.nz//WCC/ExternalTenderDetails.htm?id=32277390

Middleton Road Gabion Basket Wall (CN114.00332)

Buyer
Wellington City Council
Country
New Zealand
Published
August 15, 2025
Deadline
September 15, 2025

Description

RFx ID: 32277390 Organisation: Wellington City Council Open date: Friday, 15 August 2025 12:00 PM +12:00 Close date: Monday, 15 September 2025 4:00 PM +12:00 Categories: 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies Region: Wellington Overview: WCC seeks a suitably qualified and experienced contractor to complete a gabion basket retaining wall for slip protection and associated enabling/auxiliary works. Of high importance is the management of stakeholder relationships and environmental protection. The proposed new retaining wall works comprise: 1. Traffic Management & Site Setup – Implement temporary traffic control, locate and protect services, and establish the site with necessary erosion and sediment controls. 2. Stream Management – Divert the stream to facilitate safe construction. 3. Retaining Wall Construction – Install the gabion basket retaining wall as per the design specifications. 4. Pedestrian Bridge Installation – Replace the relevant section of the existing timber pedestrian bridge deck. 5. Subbase Upgrade – Replace the existing subbase fill with low-strength concrete as detailed in the drawings. 6. Completion & Compliance – Finalise construction, submit as-built records, PS3 certification, and complete the contract requirements. WCC seeks a suitably qualified and experienced contractor to complete a gabion basket retaining wall for slip protection and associated enabling/auxiliary works. Of high importance is the management of stakeholder relationships and environmental protection. The proposed new retaining wall works comprise: 1. Traffic Management & Site Setup – Implement temporary traffic control, locate and protect services, and establish the site with necessary erosion and sediment controls. 2. Stream Management – Divert the stream to facilitate safe construction. 3. Retaining Wall Construction – Install the gabion basket retaining wall as per the design specifications. 4. Pedestrian Bridge Installation – Replace the relevant section of the existing timber pedestrian bridge deck. 5. Subbase Upgrade – Replace the existing subbase fill with low-strength concrete as detailed in the drawings. 6. Completion & Compliance – Finalise construction, submit as-built records, PS3 certification, and complete the contract requirements.

Open original notice

Get tenders like this in one daily alert

Use this notice as context when Tenqual drafts your search scope and fit criteria.

Create free alert
Middleton Road Gabion Basket Wall (CN114.00332) tender | Tenqual