9999--West Haven Grounds and Maintenance
- Country
- United States
- Published
- March 31, 2026
- Deadline
- April 7, 2026
Description
{"description":"VA Connecticut Healthcare System\nWest Haven Boiler #3 Inspection and Repairs\nPage 2 of 2\n\nCombined Synopsis Solicitation West Haven VAMC Grounds Maintenance\n (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.\n(ii) The solicitation number is 36C24126Q0370 and the solicitation is issued as a request for quotation (RFQ).\n(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06.\n(iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 561730 and small business size standard is $25.0 million.\n(v) The Government intends to award a firm-fixed price award for Grounds Maintenance at the West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. \n(vi) The Contractor shall provide all resources necessary to provide Ground Maintenance IAW the attached (Performance Work Statement). Please see the attached PWS for full requirement details.\n(vii) The Place of Performance is West Haven and Newington as described per the (Performance Work Statement).\n(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. \nSite Visit: TBD\nSubmission of Quotes: \n(1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.\n(2) Offerors shall submit their quotes electronically via email to sheena.carlyle@va.gov.\n(3) Questions: Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is April 2 2026 by 12:00 PM EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers.\n(4) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.\nEvaluation Process: \nAward shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.\nOfferor quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. \nThe Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: \nPrice (Follow these instructions):\nOfferor shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces. \nPast Performance:\nOfferor shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. \nTechnical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner. \nContractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement).\nContractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement).\nIf you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.\nSAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer.\nVISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. \n(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.\n(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) \nSubcontracting Commitments - Monitoring and Compliance \nThis solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.\n(xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.204-10, 52.209-6, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-36, 52.222-50, 52.223-18, 52.232-33, 52.222-41, 52.222-43 (Wage Determination Applicable (Manchester 2015-4019 Rev 23 posted on beta.sam.gov)\n (xiii) All contract requirement(s) and/or terms and conditions are stated above.\n(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.\n(xv) RFQ responses are due April 7 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: sheena.carlyle@va.gov. Hand deliveries shall not be accepted.\n(xvi) The POC of this solicitation is sheena.carlyle@va.gov) \n\n\n\n\n\n\n\n\n\nATTACHMENT 1\nPRICE SCHEDULE\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\nBase\nFire Life Safety Review \n1.00\nJB\n__________________\n__________________\n\n\n\n\n\n\n\n\n\n\nGRAND TOTAL\n__________________\n\n\n\n\n\n\n\n\n\n\n\n\n\nATTACHMENT 2\nPAST PERFORMANCE WORKSHEET\n1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization:\n2. Contracting Activity Address:\n3. Contract Number:\n4. Date of Contract Award:\n5. Beginning Date of Contract:\n6. Completion Date of Contract:\n7. Contract Value:\n8. Type of Contract:\n9a. Technical Point of Contact: \n9b. Contracting Point of Contact:\nName:\nName:\nTitle:\nTitle:\nAddress:\nAddress:\nTelephone:\nTelephone:\nEmail:\nEmail:\n10. Place of Performance:\n11. Description of Work (Use a continuation sheet if necessary):\n12. List any commendations or awards received: \n13. List of Major Subcontractors:\n\n\n\n\n\n\n\n\n\nATTACHMENT 3\n\n\n\n\n\n\n\n\n\nSTATEMENT OF WORK\nWEST HAVEN GROUNDS MAINTENANCE\n\nVA CONNECTICUT HEALTHCARE SYSTEM (VACHS) \nVA MEDICAL CENTER WEST HAVEN\n950 Campbell Avenue\nWest Haven, CT 06516\n\n\nBACKGROUND\nVA Connecticut Healthcare System requires annual services for grounds maintenance, snow and ice removal, hauling, and treatment services at the West Haven VA Medical Center.\n\nJUSTIFICATION\nServices are required to support active Medical Center access and operations 24-hour access 7 days a week for veterans and staff. \n\nPLACE OF PERFORMANCE\nThe place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516\n\nPERIOD OF PERFORMANCE\nBase contract period shall be 05/01/2026 04/30/2027. The contract will also contain provision for four (4) annual option years: \nOption Year 1: 05/01/2027 04/30/2028\nOption Year 2: 05/01/2028 04/30/2029\nOption Year 3: 05/01/2029 04/30/2030\nOption Year 4: 05/01/2030 04/30/2031\n\nQUALIFICATIONS\nTo be considered eligible for consideration, potential bidders shall have a field service representative located within 200 miles of, and a minimum response time of 2 hours to, the West Haven Campus of the VA Connecticut Healthcare System and have proper equipment, materials, and support to provide services. Bidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract. \n\nThe Contracting Officer (CO) and/or Contracting Officer s Representative (COR) specifically reserve the right to reject any of the Service Provider s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided. \n\nMandatory Pre-Bid Site Visit\nInterested bidders shall participate in a mandatory pre-bid site visit and walk through at the VA Medical Center West Haven located at 950 Campbell Avenue; West Haven, CT 06516. \n\nBidders shall meet at Building 15 in the Facilities Management Service conference room to complete a sign-in sheet that will be submitted to the VA Contracting Officer. \n\nA temporary badge will be required upon arrival to Building 15. A valid Driver s License (any state) is required to obtain a temporary badge. VA Connecticut Healthcare System Facilities Management Maintenance Staff will escort an on campus walk through of all parking lot areas, drives, bays, salt shed storage, snow piling location(s) and any adjacent and/or ancillary spaces. Specific questions shall be directed to the VA Contracting Officer for a response. \n\nDescription of Services\n\n1. Perform Snow/Ice Removal\n1.1 Snow Removal. The Contractor will remove snow from all sidewalks, steps, stairs, stair and ramp\nlandings and entrance ramps as shown in (Appendix A), Snow Removal Map .\n\nThe Contractor shall clear the sidewalks, steps, stairs, stair and ramp landings and entrance ramps to\ntheir full widths of snow accumulation, piles, or drifts.\n\nThe Contractor will remove snow and ice from around fire hydrants and PIV pipes as indicated on\n(Appendix B).\n\nThe Contractor will not use paved areas such as roads and parking lots shown in (Appendix D) for the\npiling and storage of removed snow. The facility has minimum snow dump area(s) available. The service provider shall pile and stack snow in a safe and efficient manner. Piles shall be stacked to maintain safety and maximum usable parking area. \n\nAll snow removal zones (Appendix D) covered by this contract are considered as high priority and are\nexpected to be worked on simultaneously.\n\nSnow will begin to be removed when accumulation meets one (1) inch and/or within one (1) hour\nafter the snow stops, whichever occurs first. This may require multiple snow/ice removals each day.\n\nThe Contractor will remove snow from all handicap access points throughout the campus (i.e. near building entrances). These areas must always remain clear of snow and ice.\n\nThe Contractor will provide roads and parking lot snow removal on the VA West Haven campus, including:\n\nSnow Removal\nRoadways and Drives [Refer to the West Haven Campus Map and Parking Lot Inventory]\nClear and remove snow at all roadways on the VA West Haven campus, including Campbell Avenue Entrance, Spring Street Entrance, Lawson Road, Service Road and to include area at Building 1 Loading Dock, Building 2 Loading Dock, Building 2 Main Entrance, Building 5 Main Entrance, Ambulance Bay, Ring Road, and area serving Building 19, Building 16, and Veterans Drive. \n\nParking Lots [Refer to the West Haven Campus Map and Parking Lot Inventory \nClear and remove all snow at all parking lots on the VA West Haven campus, including Parking Lot 1, Parking Lot 2, Emergency Room, Parking Lot 4, Parking Lot 5, Parking Lot 6, Parking Lot 7, Parking Lot 8, Parking Lot 10, Parking Lot 14, Parking Lot 15, Parking Lot 16, Fisher House, Parking Lot 18, and Parking Lot 24.\n\nShoveling \nClear and remove all snow at all sidewalks, building entrances on the VA West Haven campus, including Ambulance Bay at Building 2, Building 2 Main Entrance, Parking Lot 18, Spring Street, Building 19, Building 21, Building 24, Building 22, Building 5, building 27/34, Building 15, Building 15A, Building 16, Courtyard, Building 35, Building 35A, Building 36, Building 36A, Building 8, Building 8.5, Building 9, Building 39, Building 1 Morgue Loading Dock, Overlook Walkway near Building 1, Building 1 Warehouse Loading Dock, Building 1 PET CT, Steps from Overlook to Fisher House, building 11, Building 11A, Building 12, Building 12A, Building 14A, and Fisher House. \nWest Haven VA Medical Center Parking Lot Inventory\nParking Lot\nCampus Map\nRegular Spaces\nAccessible Spaces\nParking Lot 1\nP1\n10\n0\nParking Lot 2\nP2\n19\n0\nEmergency Room\nEmergency Care\nAmbulance Entry\nAmbulance Entry\nParking Lot 4 Parking Garage \nP4 & Parking Garage\n0\n8 on street\nParking Lot 5\nP5\n0\n30\nParking Lot 6\nP6\n131\n0\nParking Lot 7\nP7\n10\n72\nParking Lot 8\nP8\n60\n0\nParking Lot 10\nP9, P10, P11, P12\n906\n8\nParking Lot 14\nP14\n19\n0\nParking Lot 15\nP15\n38\n0\nParking Lot 16\nP16\n12\n0\nFisher House\nP17; Gate Operated\n\n\nParking Lot 18\nP18\n164\n11\nParking Lot 24\nBuilding 24\n9\n0\nTotal\n\n1378\n129\n\nWest Haven VA Medical Center Sidewalk/Walkway and Building Entrance Inventory\nDescription\nCampus Map/Building Numbers\nArea (SF)\nSidewalk at Glade Street Parking to Spring Street\nParking Lot 18\n1053\nEmergency Room\nEmergency Care/Ambulance Bay\n295\nParking Lot 4 (New Parking Garage Open January 2025) \nParking Lot 4 (Parking Garage Not In Contract). \n600\nBuilding 2 Main Entrance and Sidewalk to Glade Street and Spring Street\nParking Lot 4, Parking Lot 5, Building 2, Parking Lot 3 \n1195\nSidewalk/Walkways from Ambulance bay to Building 2 Primary Care Entry along Spring Street\nBuilding 2, Parking Lot 2\n961\nCourtyard\n25\n1400\nSidewalk over Overlook\nParking Lot 13\n218\nStairs from overlook to Fisher House, and Sidewalks/Walkways at Lower Buildings along Campbell Avenue\nBuilding 11, Building 12, Building 11A, Building 12A, Building 14A, Fisher House\n1624\nSidewalk along Warehouse Entry to P7\nParking Lot 7, Building 39\n1451\nSidewalk/Walkways near Out Buildings 8, 8.5 and 9\nParking Lot 7, Building 8, Building 8.5, Building 9\n674\nSidewalk/Walkways near Building 5, Building 27/34, and Building 21\nBuilding 5, Building 34, Building 27, Building 21\n480\nWalkway/Building Entrance B24\nBuilding 24\n53\nSidewalk/Walkways and Building Entrance B22\nBuilding 22\n41\nSidewalk/Walkways and Entrances to Building 15A and Building 19\nBuilding 15A, Building 19\n466\nSidewalk/Walkways from Building 15 to Building 36\nBuilding 15, Building 35A, Building 35, Building 36\n1451\nSidewalk/Walkways at P8 and P9\nParking Lot P8 and Parking Lot P9\n674\nTotal\n\n12,636 SF\n\nSnow will be piled in such a manner as to maintain as many parking spaces as possible. At the end of\neach snowstorm contractor will be responsible for clearing 100% of site parking spaces per Appendix\nD. Snow can be moved to a limited number of on-site storage areas as directed by the COR or\ndesignee. \n\nDrive lanes will need to be plowed regardless of parking lot occupancy levels. Ice melt application is part of all snow events. Ice melt application shall be applied at a minimum with each snow/ice melt removal as defined above. Ice and snow melt materials are to be provided by the contractor as part of this contract.\n\n1.2 Ice Removal. The Contractor shall immediately treat and remove ice to provide secure footing on\nall sidewalks, steps, stairs, stair and ramp landings and entrance ramps (Appendix A) and at the\ncovered in this contract. The contractor will use an approved environmentally friendly ice melt product of Calcium Magnesium Acetate (CMA) such as Inferno or equal. The contractor may not use sand in lieu of approved snow melt.\n\nThe Contractor will use a salt to treat roads and parking lots or other approved ice control products\napproved by the COR. A bulk salt storage area will be provided on site for contractor use.\n\n1.3 Personnel Management. Contractor shall provide supervision as needed for full and proper\nutilization of contractor staff and coordination with the VA COR or Facilities Management Service designee.\n\nContractor is responsible to ensure time billed to the Government adequately and properly accounts for\nwork effort required for each snow/ice event. Provide standard log forms for review and approval by COR prior to the beginning of each option year. Submit daily activity logs and reports documenting each day s activities on campus.\n\n1.4. Service Delivery Summary. The contractor service requirements are summarized into\nperformance objectives that relate directly to mission essential items. The performance threshold\nbriefly describes the minimum acceptable levels of service required for each requirement. These\nthresholds are critical to mission success.\n\n1.5 Response Time & Hours of Operation\nThe contractor will be required to provide 24/7 response to snow/ice events within a one (1) hour time\nframe.\n1.6 Parking Garage Snow Removal\n\nPrior to each winter snow season, and occurring not later than November 1 of each contract year, the contractor and the COR plus VA representatives shall inspect all levels and surfaces in the garage for visible signs of damage. The contractor shall provided a written report, with photographs, documenting all damage identified by the group, no later than 10 calendar days after completion of the walkthrough for review. The COR will review and concur or return comments based on the report contents. The report shall serve as the basis for assessing damage following snow removal activities throughout the winter.\n\nThe snow removal at the West Haven VA Garage shall be accomplished by using approved snow\nremoval equipment and tools and by utilizing the snow gate and dumping area on site at the garage.\n\nThese areas shall be reviewed prior to work being performed with the contractor responsible for snow\nremoval. This shall be for the roof level of the garage where snow can accumulate during a snow\nevent. Prior to the first snowfall of the season the contractor shall perform the below items to ensure\nthe safety and protection of people and the Garage.\n\nClearly mark any expansion joints that will not be visible to the operator when snow is present to\nprevent damage during plowing operations.\n\nEstablish a snow removal logistics plan for plowing and dumping over the side at the snow gate. Foot\ntraffic areas to be first then deck.\nEnsure that area where snow will be dumped is roped off and protected from pedestrian traffic.\nInspect snow gate for functionality and train operator(s) on use and fall protection that may be required\nwhen gate is open.\n\nEnsure equipment used to move snow from the bottom of the snow gate to another location on campus is approved for use on sidewalks and landscaping.\n\nThe following items identify the recommended process for snow removal while using a plow.\nPlows shall approach seams on the deck at no greater than a 75-degree angle as best as possible and\nreasonable\n\nTo prevent premature joint failure or damage, plow shall be held up roughly 1\" from the deck surface\nwhile plowing.\nPiling of snow is not authorized as the Garage was not designed for snow loading. A small\npile at the snow gate prior to pushing over is okay, but not for long term.\n\nThe following identifies equipment that can/shall be used for snow removal on the Garage.\nSnow shovels can always be used.\n\nPlow trucks shall not exceed 10,000 pounds fully loaded including any salt/sanding unit.\n\nPlow cutting edges or any other snow removal blades that will come into contact with the precast\nsurface shall have a well-maintained rubber tipper blade/edge on them.\n\n2. De-Icing\nIce will accumulate on the upper deck and lower decks from precipitation or snow/ice melt from\nvehicles. The use of de-icing chemicals on Precast Concrete shall be monitored closely for proper,\ncompatible, chemicals as using the wrong product can and will adversely affect the garages efficiency\nand longevity. This will lead to additional maintenance costs down the road.\nPrior to the first freeze of the season, the Contractor performing the work will provide the following.\nSubmit the product they intend to use with at least one (1) alternate material in the event there is a\nshortage on the primary material.\n\nWalk the garage with maintenance team to ensure no drains are plugged or causing any ponding on the\ndeck.\n\nWalk the garage to review any potential areas where constant attention may be required.\nChemical deicer's come in many types, but only a select few are safe for use on precast concrete\nsurfaces. Below are the only products authorized for use.\n\nCalcium Magnesium Acetate (CMA) works like rock salt, but does melt snow and ice slower, but it\nhas no adverse effect on the concrete\n\nUrea Based deicer's may also be used but require a heavier application than the CMA.\n\nEquipment for de-icing must meet the same requirement for snow removal. Any truck-based spreader\nshall not exceed 10,000 pounds between truck and spreader. Hand spreaders, walk behind, etc. are\nokay to be used and are recommended.\n\n3. Snow Removal Performance Objectives\nPerformance Objectives\nSOW Paragraph\nPerformance Standard\nAcceptable Quality Level\nSnow Removal\n1.1\nSnow is removed per section 1.1. Areas covered are safe for pedestrian and vehicle traffic\nCustomer complaints do not exceed 2 per snow event. \nIce Control/ Removal\n1.2\nIce is treated and removed and is safe for pedestrian and vehicle traffic. Areas have adequate amount of ice melt used for conditions. \nCustomer complaints do not exceed 2 per ice event. \n\n2. Maintain Improved Grounds\n2.1. Mow Improved Grounds. Grass shall be cut on approximately 30 acres of improved grounds at\nthe West Haven VA Medical Center (Appendix C).\n\nGrass clippings shall be removed or mulched when visible after mowing including from sidewalks and paved areas. Contractor shall maintain the growth of grass height on improved grounds between 3 to 6\ninches. The height is a guideline for a neat and professional appearance. All improved grounds shall\nalways look well-manicured. Portable high CFM blowers will not be used to remove trimmings and\ndebris from sidewalks and paved areas during normal working hours where there are personnel and/or\nwhere vehicles are parked.\n\n2.2 Edging. Sidewalks, driveways, curbs, and other concrete or asphalt edges located in the improved\ngrounds areas shall be edged at least every other mowing.\n\n2.3 Trimming. Grass and weeds shall be trimmed around trees, shrubs, buildings, fences, poles, posts,\nfire hydrants, parking lot bumper blocks, boulders, and other fixed obstacles. Trimming height shall\nmatch surrounding area grass heights. This task involves all improved grounds as shown in (Appendix\nC). \n\nAll areas shall be trimmed concurrent with mowing. Damage to trees and shrubs from trimming shall be repaired by the contractor. If a plant should die or become unhealthy due to damage, the contractor will be responsible for replacing the damaged plant with a plant of same size and type. Plant replacement shall occur within 15 days of noticed or reported damage.\n\nContractor shall use caution and proper equipment/tools for edging performed near vehicles, buildings, and personnel. Contractor shall adjust their working times and hours at no cost to prevent damage to these items.\n\n2.4 Irrigation. The Contractor will maintain and conduct spring turn-on and fall winterization of the\nirrigation system in front of Building 2 and within the island for the main flagpole near the parking\ngarage.\n\n2.5 Fall Leaf Removal. During the fall months, fallen leaves & branches shall be removed from those\nareas indicated in (Appendix C). Legally dispose of all debris at an off-site location in accordance with existing local, state, and federal regulations.\n\n2.6. Repair Damaged Areas. Improved ground areas damaged by contractor vehicles and/or\nequipment shall be seeded or sodded to meet the standards of surrounding areas. Areas other than lawn areas will be repaired and restored to match the surrounding area.\n\n2.7. Damaged or fallen tree removal. The Contractor will be responsible for removing any downed\ntree limbs and/or fallen trees on site. The Contractor must possess the proper equipment to safely\nremove damaged or fallen trees to include bucket truck, chipper, and trained chainsaw crews.\n\n2.8. Apply Fertilizer and/or Lime. Not in the scope of work.\n\n2.9. Perform Pest Identification and Control. Not in the scope of work.\n\n2.10. Aerate Soil. Not in the scope of work.\n\n2.11. Emergency and Special Events Services. Not in the scope of work.\n\n3. Maintain Semi-Improved Grounds\n\n3.1 Mow Semi-Improved Grounds. Grass cutting shall be accomplished on 5 acres of semi improved\ngrounds as indicated in Appendix C. Contractor shall maintain grass on semi-improved grounds as set forth in Appendix C from 8 to 12 inches in height.\n\n3.2 Service Delivery Summary. The contractor service requirements are summarized into\nperformance objectives that relate directly to mission essential items. The performance threshold\nbriefly describes the minimum acceptable levels of service required for each requirement. These\nthresholds are critical to mission success.\n\nPerformance Objectives\nSOW Paragraph\nPerformance Standard\nQuality Assurance\nMaintain improved and semi-improved grounds. \n3.1\nGrass is maintained within proper height for its area. \nEdging, trimming, leaf removal and repair to damaged areas done per the specifications in a timely manner. \nCustomer complaints shall not exceed 2 per month. \n\n4. Maintain Storm Drains\n\n4.1 Storm Drain Cleaning. Storm drain maintenance and cleaning shall be accomplished on the full inventory of storm drains as indicated in Appendix E and Appendix F. Contractor shall maintain storm drains bi-annually in the month of April and October to perform cleaning by removing drain covers, cleaning excess debris inside the drain pipes, inspect at the sewer drain termination point, perform flushing of drain pipes, replace storm drain and termination covers, and inspect grates. \n\nDocument any broken or defective catch basins. Contractor shall notify the Contracting Officer and COR or designee of any such identified catch basins. If broken or defective catch basins prevent services from being completed at that time, coordinate a time to complete the service with the Contracting Officer and COR. \n\nImmediately notify the COR of any observations of discharges of sediments or pollutants into the stormwater systems in order to address potential contamination or impact to the system and/or the surface water body. \n\nThe mechanical storm (vacuum truck or manual) drainage cleaning operation shall be completed in such a manner that there is no damage to the storm drainage structures, inlet grates, manhole covers, pipes or pipe pints. The contractor shall remove the drainage structure grate or cover (if necessary) and remove by mechanical means all materials that obstruct either the structure opening, interior structure pipe openings or pipes such as grass, FboNotices, or debris. \n\nSubmit cleaning and inspection report to include all deficiencies, inspection data, and photographs within 14 calendar days to the VA Contracting Officer and COR.\n\n4.2 Disposal. Sediment, waste materials and liquids collected in a stormwater system often contain petroleum, heavy metals, and organic matter. As a result, Toxicity Characteristic Leaching Procedure (TCLP) testing or analysis requirements for the destination disposal facility may be required. All testing or analysis are the responsibility of the contractor. \n\nThe debris removal process shall be compliant to the National Pollutant Discharge Elimination System (NPDES) MS4 Permit and the Department of Natural Resources and Environment Regulations. \nDecanting liquids and/or solids back into the stormwater system or sanitary sewer is strictly prohibited.\n\nProvide appropriate disposal of petroleum, contaminated water/oil (liquid phase) in accordance with the US Environmental Protection Agency (USEPA) applicable regulations. Submit disposal reports to the VA Contracting Officer and VA COR within 30 calendar days of each scheduled cleaning. \n\nPerformance Objectives\nSOW Paragraph\nPerformance Standard\nQuality Assurance\nMaintain Storm Drains \n4.1\nStorm drains are maintained and cleaned annually and full report received in a timely manner. \nCustomer complaints shall not exceed 1 per year. \nDisposal\n4.2\nSubmit disposal report.\nCustomer complaints shall not exceed 1 per year. \n\n5. Sign-In/Out & Badging\nAll Service Provider personnel, sub-Service Providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours. \n\n6. Parking\nParking is rigidly controlled at the facility. Contractor parking instructions shall be provided by the\nCOR. Parking in designated patient parking areas is strictly prohibited. Parking on grass is also\nprohibited. Depending on the severity of the snowstorm, the contractor may be limited to the number\nof vehicles they can park on the VAMC site. Accommodations will always be made for a contractor\nwork vehicle transporting personnel, equipment, and snow melt. Parking passes will be issued to the\ncontractor for the season for work vehicles by the VA Police Office.\n\nOne contractor vehicle is allowed to park on site Monday to Friday 6:00 a.m. to 5:00 p.m. Outside of those hours, any number of vehicles may park on site only when work is being performed under this contract. No parking will be permitted within the parking garage or patient designated areas at any time. \n\n7. Ordering Activities and Procedures\nIndividual Task Orders may be issued on an as needed basis during the period of performance specified. Contractor shall have the ability to accept credit card orders.\n\n8. Changes to Performance Work Statement\nAny changes to this original Performance Work Statement as part of the establishment for the contract\nshall be authorized and approved only through written correspondence from the Contracting Officer.\n\n9. Invoicing Acceptance\nThe Contractor shall submit invoices related to this effort through Tungsten Network, formerly known\nas OB10 with a copy sent by email to the COR. These invoices shall contain the following\ninformation:\n\nContract Number:\nPurchase Order Number:\nContractor Name:\nInvoicing Period/Date of Service: \n\nPrior to submitting invoice, provide all required written documentation. In addition to licensure, safety inspections, insurance and registration, provide the following:\nName of each operator personnel. \nEquipment Description.\nEquipment Quantity.\nPlow size with corresponding plate number.\nTruck size with corresponding plate number. \nEquipment Logs.\nOperator Logs.\nTotal snow removed (cubic yards) for the day.\nApproximate time load left site. \nApproximate time of delivery to dump.\nApproximate quantity of load.\nDump Tickets.\nA print out of the applicable snow total from the National Weather Service/NOAA is required to be submitted with all invoices. \n\nAll logs and tickets shall identify equipment, operator, quantity, location with date and time(s), start and stop times. Service provider shall certify that written documentation has been reviewed for accuracy and is complete. \nInvoices for credit card authorized work will be sent to the COR.\n10. Contract/Task Order Termination\nVA has the right to terminate (in whole or in part) the contract and/or task order(s) issued against it at\nany time. The Contractor will be paid only for the services rendered up to the point of receiving the\ntermination notice, and then only to the extent that those services meet the requirements of this SOW.\nThe Contracting Officer for this contract may cancel with 30 days written notice to the Contractor.\n\n11. Contractor Personnel Security Requirements\nAll contractor personnel shall obtain a short-term identification badge issued by the COR. Such badge\nshall be worn by the individual and prominently displayed at all times while on VA Property. No\nemployee of the contractor shall enter the medical center and outer buildings without a valid\nidentification badge issued by the VA. In order to obtain a short-term identification badge, contractor\npersonnel shall present to the COR a valid (non-expired) photo identification issued by a US federal,\nstate or local government agency.\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\n12. Appendices\n1. Appendix A Sidewalks, Entrances and Ramps\n2. Appendix B Equipment and Storage\n3. Appendix C Grass Mowing Map\n4. Appendix D Lots and Roads\n5. Appendix E Storm Drains West Haven\n6. Appendix F Storm Drains Newington\n\nPrice/Cost Schedule\nTotal inches of snow are based on total snowstorm accumulation as reported by the National Weather Service for West Haven, Connecticut. \n\nSnow Removal and Ice Control\nBase Year\nLine Item\nDescription\nPrice\n1\nDusting to 3 \n$\n2\n3.1 6 \n$\n3\n6.1 9 \n$\n4\n9.1 12 \n$\n5\n12.1 16 \n$\n6\n16 +\n$\n7\nIce melt/sanding per application on walkways, building entrances, landings, and steps\n$\n8\nPlow parking lots lanes only during normal business hours\n$\n9\nEmergency Response\n$\n10\nSnow Relocation on site per cubic yard\n$\n11\nHourly Rate for Miscellaneous Snow Removal, not covered above, not to exceed 120 hours. \n$\n\nGrounds Maintenance\nBase Year\nLine Item\nDescription\nPrice\n12\nFall Clean-up consisting of leaf removal and disposal off site per clean up\n$\n13\nGrass Cutting and Trimming per cut\n$\n14\nBi-Annual Campus Storm Drain Cleaning West Haven\n$\n15\nBi-Annual Campus Storm Drain Cleaning Newington\n$\n\nSnow Removal and Ice Control\nOption Year 1\nLine Item\nDescription\nPrice\n1\nDusting to 3 \n$\n2\n3.1 6 \n$\n3\n6.1 9 \n$\n4\n9.1 12 \n$\n5\n12.1 16 \n$\n6\n16 +\n$\n7\nIce melt/sanding per application on walkways, building entrances, landings, and steps\n$\n8\nPlow parking lots lanes only during normal business hours\n$\n9\nEmergency Response\n$\n10\nSnow Relocation on site per cubic yard\n$\n11\nHourly Rate for Miscellaneous Snow Removal, not covered above, not to exceed 120 hours. \n$\n\nGrounds Maintenance\nOption Year 1\nLine Item\nDescription\nPrice\n12\nFall Clean-up consisting of leaf removal and disposal off site per clean up\n$\n13\nGrass Cutting and Trimming per cut\n$\n14\nBi-Annual Campus Storm Drain Cleaning West Haven\n$\n15\nBi-Annual Campus Storm Drain Cleaning Newington\n$\n\nSnow Removal and Ice Control\nOption Year 2\nLine Item\nDescription\nPrice\n1\nDusting to 3 \n$\n2\n3.1 6 \n$\n3\n6.1 9 \n$\n4\n9.1 12 \n$\n5\n12.1 16 \n$\n6\n16 +\n$\n7\nIce melt/sanding per application on walkways, building entrances, landings, and steps\n$\n8\nPlow parking lots lanes only during normal business hours\n$\n9\nEmergency Response\n$\n10\nSnow Relocation on site per cubic yard\n$\n11\nHourly Rate for Miscellaneous Snow Removal, not covered above, not to exceed 120 hours. \n$\nGrounds Maintenance\nOption Year 2\nLine Item\nDescription\nPrice\n12\nFall Clean-up consisting of leaf removal and disposal off site per clean up\n$\n13\nGrass Cutting and Trimming per cut\n$\n14\nBi-Annual Campus Storm Drain Cleaning West Haven\n$\n15\nBi-Annual Campus Storm Drain Cleaning Newington\n$\n\nSnow Removal and Ice Control\nOption Year 3\nLine Item\nDescription\nPrice\n1\nDusting to 3 \n$\n2\n3.1 6 \n$\n3\n6.1 9 \n$\n4\n9.1 12 \n$\n5\n12.1 16 \n$\n6\n16 +\n$\n7\nIce melt/sanding per application on walkways, building entrances, landings, and steps\n$\n8\nPlow parking lots lanes only during normal business hours\n$\n9\nEmergency Response\n$\n10\nSnow Relocation on site per cubic yard\n$\n11\nHourly Rate for Miscellaneous Snow Removal, not covered above, not to exceed 120 hours. \n$\n\nGrounds Maintenance\nOption Year 3\nLine Item\nDescription\nPrice\n12\nFall Clean-up consisting of leaf removal and disposal off site per clean up\n$\n13\nGrass Cutting and Trimming per cut\n$\n14\nBi-Annual Campus Storm Drain Cleaning West Haven\n$\n15\nBi-Annual Campus Storm Drain Cleaning Newington\n$\n\nSnow Removal and Ice Control\nOption Year 4\nLine Item\nDescription\nPrice\n1\nDusting to 3 \n$\n2\n3.1 6 \n$\n3\n6.1 9 \n$\n4\n9.1 12 \n$\n5\n12.1 16 \n$\n6\n16 +\n$\n7\nIce melt/sanding per application on walkways, building entrances, landings, and steps\n$\n8\nPlow parking lots lanes only during normal business hours\n$\n9\nEmergency Response\n$\n10\nSnow Relocation on site per cubic yard\n$\n11\nHourly Rate for Miscellaneous Snow Removal, not covered above, not to exceed 120 hours. \n$\n\nGrounds Maintenance\nOption Year 4\nLine Item\nDescription\nPrice\n12\nFall Clean-up consisting of leaf removal and disposal off site per clean up\n$\n13\nGrass Cutting and Trimming per cut\n$\n14\nBi-Annual Campus Storm Drain Cleaning West Haven\n$\n15\nBi-Annual Campus Storm Drain Cleaning Newington\n$\n\nSUBMITTALS/DELIVERABLES\nThe VA shall furnish a site map of the West Haven VA Medical Center and Inventory of Parking Lots and total number of parking spaces. \n\nProvide copy of equipment safety inspections to Contracting Officer prior to use. \n\nProvide copies of all personnel qualifications, training, and licenses as applicable for the work.\n\nThe service provider shall provide electronic copy of all services performed to the Contracting Officer, COR, and Facilities Management Service Maintenance Supervisor within 48 hours of services provided. \n\nGENERAL\nGeneral: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.\n\nThe Service Provider shall remain responsible for operating and maintaining the site in full accordance if the requirements of this solicitation. \nThe Service Provider shall develop and provide to the VA the following:\nSafety Plan: The Service Provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (TJC) requirements), NFPA, Federal and State codes pertinent to the project scope.\n\nPer VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service Providers and their employees.\nNo photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time. \n\nParking for Service Provider and its employees shall be in designated areas only. Service Provider to coordinate with COR. \n\nThe Service Provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service Provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service Provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others. \n\nBilling: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. \n\nNARA Records Management Requirements\n\nThe following standard items relate to records generated in executing this contract:\n\nCitations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.\n\nContractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.\n\nContractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.\n\nContractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. \n\nThe Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. \n\nThe Government Agency owns the rights to all data/records produced as part of this contract. \n\nThe Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. \n\nThe Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].\n\nNo disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. \n\nThe Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. \n\n\n"}
Get tenders like this in one daily alert
Use this notice as context when Tenqual drafts your search scope and fit criteria.